Laserfiche WebLink
<br />31 <br /> <br />Preventative Maintenance mud MH adjusting rings within the below structures- <br />• MH 5-027 <br />• MH A-188 <br />• MH A-166 <br />• MH A-168 <br />• MH A-158 <br />• MH A-157 <br />• MH A-138 <br />• MH A-137 <br />• MH A-105 <br />• MH A-106 (also check for lid replacement needed) <br />• MH 13-021 (PMP scheduled for 2026. Mud rings for now.) <br /> <br />Lift Station 5 Forcemain and valve vault improvements <br />Staff is working with Bolton & Menk to design and coordinate construction, rerouting the forcemain for <br />lift station 5. The new location will follow County Rd E west to the Elmer Anderson trail and discharge <br />into a rebuilt manhole at Stowe Ave and New Brighten Rd. <br />Lift Station 2 Improvements <br />The lift station improvements include pump replacement, guide rails, wet well plumbing, and floats/ <br />transducer replacement. <br />Mainline Tree Root Treatment <br />We will be combining a small list from 2023 to the 2024 list for a contractor to complete chemical root <br />treatment. This process aids in tree root growth, stunting the growth for a period of time. In addition, <br />our crew saves time by reducing the need to hydraulically cut the roots from the pipes. <br />2026 PMP sanitary sewer inspections - Public Works will be inspecting all sanitary sewer elements within <br />the 2026 PMP corridor to determine needs while developing and budgeting for that project. The 2026 <br />PMP is located around the Karth Lake neighborhood (inspection maps not currently created). <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />