Laserfiche WebLink
<br />36 <br /> <br />2026 PMP Stormwater Inspections – Public Works will be inspecting all stormwater elements within the <br />2026 PMP corridor to determine needs while developing and budgeting for that project. The 2026 PMP <br />is located around the Karth Lake neighborhood (inspection maps not currently created). <br />Culvert Rehabilitation at Chatham Open Space – Through inspections, Public Works has identified 4 <br />culverts within the Chatham Open Space that are in need of rehabilitation. The amount of work is <br />substantial and will require planning and budgeting over 2024 to plan for the work to be done in 2025. <br />Carryover Projects from 2023 (Priority scheduling for spring/early summer for these projects) <br />• Catch basin repairs, and surface water repairs identified with a check mark have been <br />completed. The other items are remaining and will need to be completed spring of 2024 prior to <br />the large area patching project. This also includes some sanitary sewer manhole casting <br />adjustments. <br /> <br /> <br /> <br /> <br /> <br /> <br />