Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />8 <br /> <br />imaediate service as being $90,000. Now, the reason that was <br />done is that it's the $40,000 that is the increased Ct'st that <br />will be incurred because of Rot.ville having to enlarge its <br />sewer - the section that Mr. Short showedycu on the map - f0r <br />us to C0nnection, Roseville has to enlarge their sewer and it was <br />felt this should be paid by the en61re area since the entire area <br />described in the shaded pation of the map would eventually connect <br />into that very same cutIet. It would not be hasibla to just <br />charge the small portion, not only the cost of enbrging the <br />Rosevilla sewer when really a greater portion of the Village '411 <br />benefit and also the immediate assessment and so the Council <br />determined and it was done on the recommendation of ~/self and <br />Mr. Short that since a larger area than just that immediate 80 <br />acres would benefit by this enlargement of it that the area that <br />'would eventually drain and be served by Arden Hills into Roseville <br />should help bear that cost and so that $40,000 is then spread <br />over the entire area and the $90,000 is just spread in the 80 acre <br />portion that will get immediate service. <br />llow tha assesslD8nts you will notice - No.6 - will run $12.60 <br />a front foot. That will be the 80 acres in that Southeastern <br />portion that will get complete sanitary service. Since some of <br />the land is unplatted property, you will notice there is a <br />$400. DO per acre charge which is cc,ns1stent with other suburban <br />areas. The service connection stub is merely the connection frOlll <br />the line or the lateral in front of the street out to the roadway <br />so that you don't have tc break up the blacktop and get outside <br />of the roadway itself. In tJG. 7 the assessment for the balance <br />of the area would be this $.60. This is that larger portion which <br />