Laserfiche WebLink
<br /> 4- <br /> . study and therf are - I Fan'tgive you tl\~ exact figures - but there <br /> are several tMusand dollarsexperided for this and the only way <br /> that the construction is done is after competetive bids. We don't <br /> de any constructing. The law is clear that the plans and specifications <br /> are prepared - must be prepared by law., They must be approved by <br /> the State Beard of Health and, in this particular ease, they must <br /> further be apprcved by the Village of Roseville and, in turn, must <br /> be approved by the City of St. Paul because ultimately it goes thrcugh <br /> St. Paul. Then after that has be.n done, if the p~oj.ct goes ahead, <br /> then the Council will advertise for bids and the lowest bidder <br /> does the construction. We merely supervise it as an architect that <br /> you .vculdengage would supervise the construction of your house <br /> and in that manner and that manner only do we cperate. we do not <br /> . build it. These estimates are an average of ccnstruetioncosts for <br /> comparable sewers in this area and in that way and th.t way enly <br /> have these estimates been~epared. It's not an estimate that we <br /> come tc you and say we will build this sewer fer you at this cost <br /> because wedcn't do that and none of the other engineering firms <br /> that you mention do that either. I'm yuitefamiliar with practically <br /> a 11 of them. (Applause) <br /> MAyeR ASHBPCH: I know thisis a big decision. Things have tc <br /> be decided. <br /> MR. CALVIN WESTPHI,L, 3264 Lake Johanna Blvd.: I have several' <br /> questiens. One which may seem. way out in left field, but I think <br /> it's something that I wonder abcut and I. think it's semething that <br /> . hasn't COQle up earller with ragard to the footage coat being assessed <br /> by your frent fe('tag.. Is there any reason or has 1t ever been <br /> dene thi:lt you could take the to.tal cost - in other wordll, I have an <br /> - <br />