Laserfiche WebLink
<br />MUNICIPAL SEWAGE PUMPING SERVICE <br />(M3007) <br /> <br />AVAILABILITY: Available for rhe operation of pumping plants of municipally owned <br />sewage works. Lighting and heating limited to incidental use in operating power equipment. <br /> <br />. <br /> <br />(Rate schedule applied separately to each delivery point) <br /> <br />RATE: <br />First <br />Next <br />Excess <br /> <br />50 hours' use of demand @ 2.6<t per kwh <br />100 hours' use of demand @ 1.6<t per kwh <br />hours' use of demand @ 1.1<t per kwh <br /> <br />FUEL CLAUSE: There shall be added to or deducted from the monthly bill computed ac- <br />cording to the above schedule .014<t per kilowatt-hour for eacb whole cent by which the <br />cost of fuel is more or less, respectively, than 26<t per million Btu. The cost of fuel shall <br />be the average cost of fuel used during the preceding twelve months by the steam electric <br />generating stations of Northern States Power Company (Minnesota) supplying energy to its <br />interconnected transmission system serving customer, and shall include purchase cost, <br />freight, demurrage, weighing or measuring, unloading, testing, rehandling in stotage, and <br />delivery inro said steam stations. <br /> <br />MONTHL Y MINIMUM CHARGE: <br />First I HP or less of connected load - $1.00 <br />Excess HP of connected load @ $.50 per HP <br /> <br />DETERMINATION OF DEMAND: The demand in kilowatts for billing purposes shall be the <br />greatest 15-minute load during the month for which bill is rendered, but in no event shall <br />the demand to be billed be considered less than 50% of the greatest demand billed during <br />the preceding eleven months, nor less than 30 kw. For billing purposes, a ftaction of a kw <br />if less than one-half will be dropped, if one-half or more will be billed as one-half. <br /> <br />POWER FACTOR: Cus tomer shall at all rimes take and use power in such manner that the <br />power factor shall be as near 100% as possible, but when the average power factor is less <br />than 80%, customer agrees to install the necessary corrective equipment to raise such power <br />factor to at least 80%. The average power factor is defined ro be the quotient obtained by <br />dividing the kilowatt-hours used during the month by the square root of the sum of the <br />squares of the kilowatt-hours used and the lagging reactive kilovolt-ampere-hours supplied <br />during the same period. Any leading kilovolt-amp ere-hours supplied during the period will <br />not be considered in determining the avetage power factor. <br /> <br />TERM OF CONTRACT: One year, continuing theteaftet from year to year, unless cancelled <br />by either party by giving written notice at least 30 days prior to expiration of any contract <br />year. <br /> <br />.. <br /> <br />FORM 0396-40 <br />