My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 11-27-1967
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1960-1969
>
1967
>
CC 11-27-1967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2010 10:25:22 AM
Creation date
11/9/2006 11:32:01 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />"""":- "'- <br />, <br />. . <br /> ARDEN HILLS WATER IMPROVEMENT 67-1, PROJECT 1 <br /> COST ESTIMATE FOR CHANGE ORDER NO. 1 <br /> Substitute 1,000 L.F. 16" D. I.P. 0.46" wall thickness in lieu <br /> of 0.37" wall thickness for an increase of $1.40/L.F. .. $1,400.00 ' <br />I <br /> Class 5 Gravel, In Place <br /> For Base 600 Tons @ $2.30/Ton = 1,380.00 <br /> Plant Mix Bituminous Mixture (M.H.D. 2331) <br /> 3" thick, including prime 125 Tons @ $14.70/Ton = 1.837.50 <br /> TOTAL ESTIMATED ADDITIONAL COST . . . . . . $4,617.50 <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.