My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
10-28-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 9:18:36 AM
Creation date
11/13/2024 9:02:57 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Costs: <br />PSA — Public Engagement and Project Scope $12,419 <br />PSA — Design & Construction Admin <br />$79,586 <br />Arden Oaks Park Construction and Amenities <br />TBD <br />Arden Oaks Park Playground Structures <br />$172,178 <br />Arden Oaks Swing Addition <br />$4,948.78 <br />Freeway Park Construction and Amenities <br />$TBD <br />Freeway Park Structures <br />$150,434 <br />Materials Testing <br />TBD <br />Current Project Cost <br />$419,565.78 <br />Total Project Cost <br />TBD <br />Attachments <br />Attachment A — Freeway Park Survey Results <br />Attachment B — St. Croix Recreation Equipment Quote & Site Layout <br />Attachment C — MWP Swing Quote & Design <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.