Laserfiche WebLink
�Attachm��ent:A] <br />P uruzi <br />Cottonwood Removals @ Freeway Park <br />Wednesday, August 7, 2024 <br />City of Arden Hills <br />Jeff Frid <br />3540 Hudson ave <br />Arden Hills, MN 55112 <br />Phone: 651-755-1461 - Jeff <br />Email: jfrid@cityofardenhills.org <br />All work is done in accordance to ANSI tree care standards. <br />Phase 1 <br />Generated uniquely for <br />Please sign and return <br />to the office. <br />This is an estimated <br />cost and prices may vary <br />upon job completion. <br />50 S Owasso Blvd East Little Canada, MN 55117 <br />651-484-2726 1 www.precisiontreemn.com <br />Estimator: Josh Hielsberg I Consulting Arboris <br />Precision Landscape & Tree, Inc. <br />Cell: 612-685-3404 <br />Email: josh@precisiontreemn.com <br />Worksite: 3540 Hudson ave <br />Arden Hills, MN 55112 <br />1 Cottonwood HAZARD Tree Removal <br />Remove clump of large Cottonwoods @ SE corner of the <br />Outdoor Hockey Rink (ODR) off County Rd E & Snelling S <br />entrance ramp. <br />- 1 tree split off a while ago (cleaned up by city). 1 large Center <br />tree has split off and is resting on Large tree on the E side of <br />clump <br />- due to location & height of tree's, we will contract a 60 ton <br />Crane to assist <br />- 1 Climber will need to Fly on ball of crane to set straps, 1 <br />climber to remain in tree to make cuts. BN Lift to take over once <br />tops have been removed. <br />- We will need the City to remove 4 panels & 3 post from the NW <br />corner of the ODR, crane Crane to back in from the gravel <br />parking lot to set up as close to trees as possible, allowing <br />Crane to take as big of picks as possible. All picks set down <br />inside the rink, Clam truck to Load from there. This will be the <br />easiest way to get equipment in and out w/o much turning. <br />- PLT will cut stumps as low as possible w/o damaging saw <br />- crew will take precautions working neer power lines, Crane <br />outfit will let us know if lines need to be de -energized before job <br />scheduled. If needed we will need to discuss with the electrical <br />designer for the area to get a game plan, neighbors could be <br />put out of power?? Any cost for De-Energization will be added <br />at invoicing. <br />- Haul debris (4 - 5 loads) <br />*" Once accepted we will start the process of getting the lines <br />de -energized. Scheduling will be dependant on the electrical <br />designer. <br />0 $11,250.00 <br />Subtotal: $11,250.00 <br />Page 2 of 5 <br />��r <br />Our arborists are always ISA certified: VISA w R ERN �// Minnesota <br />D�RE55 �� <br />Josh Hielsberg Certification # MN4556A Society of <br />VOICE Cr raEE caa[ ArborlCulttyun' <br />