My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCWS 04-18-2005
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2005
>
CCWS 04-18-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:12 PM
Creation date
11/9/2006 12:08:38 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS CITY COUNCIL WORKSESSION MINUTES <br /> APRIL 18, 2005 5 <br /> . Councilmember Holden recalled that the original proposal called for an irrigation system and the <br /> cost estimate was too high. <br /> City Enginccr Brown said that an irrigation system could be installed at a later date. <br /> Councilmember Larson asked if the contractor would be responsible for maintaining the plants <br /> during the warranty period. <br /> Ms. Ryan suggested that the City consider installing a water service cOlmcction at each flower <br /> bed. <br /> Mr. Brown said that the City should avoid having trucks in the Highway 96 median. It could be <br /> a safety concern for the maintenance workers. <br /> City Administrator Wolfe recapped the discussion regarding the landscaping options along <br /> Highway 96. <br /> . City Engineer will obtain bids for different types of irrigation systems or other water <br /> options; <br /> . City Council is agreeable to planting group A proposal; <br /> . URS will work with Ramsey County to determine which tree specics would work best in <br /> . the Highway 96 median area. <br /> Mr. Jim Tolaas also provided the City Council with an update on the Lexington Avcnue <br /> reconstruction project. Construction is scheduled to bcgin in mid-May. At this time, five <br /> property owners have yet to agree to sell right-of-way settlements for this project. Emminent <br /> domain hearings are tentatively scheduled for June 4th Ramsey County belicves that they could <br /> settle with four out of the five property owners at this time. Hopefully an equitable solution can <br /> bc reached. In the end, the City may have to spend morc money for property acquisition than <br /> originally anticipated. Also, a temporary easement and permanent casement for a new wall and <br /> fence in the Karth Lake area will be necessary. The estimated life expectancy for this fence is 75 <br /> years. This project is schcduled to be completed within one calendar year. <br /> Front Porch Ordinance <br /> City Planner Peter Hellegers noted that the setback cxccption for front porches was brought <br /> before the City Council at the April 11th meeting. The ordinancc was tabled by the City Council <br /> after members expressed concern about the proposed construction matcrials for front porches and <br /> the setback rcquircments. <br /> Councilmembers also expressed some concerns about allowing three season porches to be <br /> enclosed with windows or full lite doors. A concern was that the enclosed porch may detract <br /> from the sight lines and fcel of the neighborhood homes or streets. <br /> . The currently proposed language would effect the setback distance to the property lines. The <br /> proposcd language would allow porches to extend up to ten (l0) feet into the front yard or side <br /> yard, but limiting the setback to 30 feet. The existing side yard setback regulations would still <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.