My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCWS 10-11-2005 (2)
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2005
>
CCWS 10-11-2005 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:14 PM
Creation date
11/9/2006 12:08:53 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ~ <br />. ~HILLS <br /> Approved: November 14, 2005 <br /> eITY OF ARDEN HILLS, MINNESOTA <br /> eITY eOUNeIL WORK SESSION MEETING <br /> OeTOBER 11, 2005, 8:25 P.M. <br /> eITY HALL eOUNeIL eHAMBERS, 1245 WEST HIGHWAY 96 <br /> eALL TO ORDER <br /> Mayor Aplikowski called the meeting to order at 8:25 p.m. <br /> Present: Mayor Aplikowski, Councilmembers Larson, Grant, Rem and Brenda <br /> Holden. <br /> Absent: None. <br /> Staff Present: City Administrator, Michelle Wolfe; Director of Operations & <br /> Maintenance, Thomas Moore; and Recording Secretary, Kathleen Altman. <br />. eitv Hall Generator - Potential Upl!rades <br /> Mr. Moore stated at the May 13, 2002 City Council meeting, the City Council unanimously <br /> approved the purchase of a portable 200kw portable generator for City Hall. The intended <br /> purchase of this generator was to supply electrical power to City Hall during a power outage and <br /> for pmticipating in the Excel Energy Peak Power Control Program. <br /> Currently, the Operations and Maintenance Department has two portable generators to supply <br /> backup electrical power to the City's 14 lift station during a weather-related power outage. One <br /> of these generators must be permanently stationed at Lift Station #8, which is the largest with <br /> three wet wells. That leaves staff with one generator to provide backup electrical power to any <br /> number of the remaining 13 lift stations during a major weather related event. This remaining <br /> generator must travel to each of the 13 lift stations and provide just enough backup electrical <br /> power to pump the water level down to a safe level, then quickly proceed to the next lift station <br /> and perform the same task and so on down the line until every lift station is serviced. The cycle <br /> then begins again until electrical power is restored by Xcel Energy. <br /> In 2005, there have been tluee weather-related events where five or more lift stations, including <br /> Lift Station #8, were without electrical power. In addition, there have been two weather-related <br /> events where between two and four lift stations were without electrical power, one of which <br /> involved Lift Station #8. <br />. In order to have the existing City Hall generator available to assist in lift station operations during <br /> a weather-related electrical power outage, upgrades in the amount of $28,670.00. <br /> 1 IMetro- inet. us lardenhillslAdrnin ICouncillMinutesl Worksession 12005110-11-05 Approved.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.