My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-04-2024 Special JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2024
>
11-04-2024 Special JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 11:19:11 AM
Creation date
11/27/2024 11:18:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />34 <br />impractical, or is determined to present an equity <br />gap, as reasonably determined by JDA. All <br />buildings using any fossil fuels must offset an <br />equivalent amount of carbon emissions each year. <br />1.3.3 Renewable Energy. All buildings in the Development <br />must install photovoltaic (PV) systems that either: <br />1.3.3.1 generate, on an annual basis, enough electricity <br />to meet one hundred twenty percent (120%) of the <br />site's anticipated energy use; or <br />1.3.3.2 include a rooftop array with a rated capacity of <br />not less than 10.75 watts per gross square foot of <br />roof area and a covered parking array for all parking <br />lots containing twenty or more parking spaces – <br />including the top level of multi-level parking <br />structures – with a rated capacity of not less than 7.5 <br />watts per gross square foot of parking area. <br />All panels used in PV systems must be rated as Tier 1 <br />panels and qualify under the Inflation Reduction Act for <br />the Investment Tax Credit. Any renewable energy credits <br />generated from PV systems in the Development shall be <br />credited to the Development as a whole. Projects that do <br />not generate enough energy, on an annual basis, to meet <br />one hundred percent of their energy use must purchase <br />green power for the remainder. <br />1.3.4 District Energy. For heating and cooling, all <br />buildings shall connect to the District Energy <br />System if a District Energy System is available to <br />them.. <br />1.3.5 Embodied Carbon. Except as otherwise expressly <br />provided herein, all buildings shall conduct a whole <br />building life-cycle assessment and achieve at least a 10% <br />reduction in global warming potential, using the <br />calculation methods established in LEED BD+C: New <br />Construction. This Section does not apply to single <br />family homes or tenant improvements within <br />commercial buildings. <br />1.4 Electric Vehicle Infrastructure. The Development shall include <br />infrastructure to support electric vehicles (EV) – as defined by the <br />International Building Code – as follows: <br />1.4.1 For non-residential parcels where four or more <br />vehicle parking spaces are provided, not less than <br />4% of the total number of parking spaces or not <br />less than 8% of designated employee-only parking
The URL can be used to link to this page
Your browser does not support the video tag.