My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-07-2024 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2024
>
10-07-2024 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 11:19:29 AM
Creation date
11/27/2024 11:19:15 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ever-greenenergy.com <br />Thermal Energy Solution Cost Analysis <br />30-Year life cycle cost analysis (2027-2057) <br />Analysis does not include additional cost <br />to build high-performance buildings and <br />in-building equipment costs. <br />•Need to engage developers to understand <br />in-building capital costs between <br />scenarios. <br />Comparison is to business as usual of <br />natural gas-fired heating equipment and <br />electric cooling <br />$97 <br />$71 <br />$84 $88 <br />$148 <br />$0 <br />$20 <br />$40 <br />$60 <br />$80 <br />$100 <br />$120 <br />$140 <br />$160 <br />Business as Usual - <br />Natural Gas & Electric <br />Scenario 1: <br />Community Energy - <br />All of RCC <br />Scenario 2: <br />Community Energy - <br />Portion of RCC <br />Scenario 3a: Full Site <br />Electric (Air-Source <br />Heat Pump) <br />Scenario 3b: Full Site <br />Electric (Electric <br />Resistance) <br />Life Cycle Operational Cost (MM$)
The URL can be used to link to this page
Your browser does not support the video tag.