My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-04-2024 PC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2024
>
12-04-2024 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 4:08:27 PM
Creation date
11/27/2024 4:04:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arden Hills 55+ Senior Housing Complex Traffic Noise Assessment <br />David Braslau Associates, Inc. Page 13 <br /> <br />3.2. Noise Model Predictions <br /> <br />Traffic noise predictions for Hwy 10 monitoring site are presented in Figure 3.2 for both the 6-7 AM <br />period (covered by nighttime standards) and the 4-5 PM period (covered by daytime standards). As can <br />be seen in the figure, monitored levels were considerably higher for the AM period than expected for a <br />speed of 55 mph. The levels are also higher during the PM period. Therefore, a speed of 65 mph has <br />been assumed for Hwy 10 with predicted levels shown in Figure 3.4 on page 14. <br /> <br /> <br /> <br />Figure 3.2 Predicted Noise Levels (dBA) with 55 MPH on Hwy 10 <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.