My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-09-24 PC Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2024
>
10-09-24 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 4:14:13 PM
Creation date
11/27/2024 4:14:10 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – October 9, 2024 2 <br /> <br />approximately 11,000 square foot commercial building on the property at 3776 Connelly <br />Avenue. This application was approved, with conditions, with Resolution 2024-038 on July 22, <br />2024. The Subject Property is currently owned by Standout Properties, LLC and the building was <br />most recently occupied by the Northern Lights Bingo Hall and Bright Side Café. The Applicant’s <br />previous proposal was to renovate the existing building and resurface the parking lot. The <br />Applicant proposed a phased development with the event center established in Phase I and <br />restaurant and adult day care uses to be established in Phase II and Phase III, respectively. With <br />the previous proposal, the Applicant sought review and approval for Phases I and II. <br /> <br />Consultant Planner Hofer stated the PUD Development Agreement was approved on <br />September 23, 2024. The Applicant is now asking to amend the Planned Unit Development <br />(PUD) Agreement to allow for the west elevation and part of the north elevation of the building <br />to have an exterior material that is not defined as a desirable material. The Applicant is <br />proposing to not replace the exterior materials on the specified elevations and to instead paint the <br />existing concrete block exterior material to match the approved exterior materials of the other <br />elevations. The Applicant has provided a description in the submitted narrative: <br /> <br />We are requesting a flexibility to allow painting of the west exterior walls in lieu of the <br />brick shown in the original submittal to the Planning Commission and City Council. <br /> <br />The west side of the building, which is the back, is not visible from the public streets to <br />the south and east or from the public parking lot. It is heavily screened by dense <br />vegetation along the west property line. <br /> <br />The paint colors would match the previously approved brick colors and be applied in the <br />same locations as the original brick colors. <br /> <br />Consultant Planner Hofer reviewed the history of the subject property, the Plan Evaluation and <br />provided the Findings of Fact for review: <br /> <br />1. The property located at 3776 Connelly Avenue is designated for Community Mixed uses <br />on the 2040 Comprehensive Plan. <br />2. New building construction or site modification identified requires the submittal of a Site <br />Plan Review application prior to construction. <br />3. For proposals for new construction, redevelopment of a site, and significant modifications <br />to existing sites in the B-3 Zoning District, a Planned Unit Development is required. <br />4. The Master and Final Planned Unit Development generally conforms to the requirements <br />of the City Zoning Code and design standards. <br />5. Resolution 2024-038 approved a Planned Unit Development for the Subject Property <br />with flexibility for the following areas: parking requirements, landscaping, building <br />materials, transparency, signage, lighting, and site furnishings. <br />6. A Master and Final PUD Development Agreement was approved by the City Council on <br />September 23, 2024. <br />7. Where the plan is not in conformance with the City Code, the Applicant has requested <br />flexibility. <br />8. Flexibility through the PUD process has been requested in the following areas: exterior <br />materials.
The URL can be used to link to this page
Your browser does not support the video tag.