Laserfiche WebLink
<br /> City Council Work Session Meeting <br /> December 19, 2005 4 <br /> . <br /> regarding the following options that were outlined in the feasibility report. The following is a <br /> summary of the design issues discussed in the feasibility report: <br /> A. Ridgewood Court Option-City Engineer Greg Brown recommends that no street <br /> improvements be made to Ridgewood Court at this time. <br /> Cowlcilmember Holden asked if Ridgewood Court would have to be reconstructed prior to the <br /> 25 year expected life expectancy of the street project. <br /> City Engineer Greg Brown reported that Ridgewood Court has a PCI rating of 100. It was <br /> overlayed six years ago and should not have to be reconstructed for 25 to 30 years. <br /> Councilmember Holden asked if the Ridgewood Court residents would be assessed for the <br /> improvements even though there will not be any work done on their street. <br /> City Engineer Brown said that all residents are proposed to be assessed for this project. <br /> B. Streets Widths-City Engineer recommends 22 foot face to face of curb. <br /> Councilmembcr Larson asked why the City Engineer is proposing to decrease the size of the <br /> . streets. The City should be consistent in requiring that a street be 24 feet wide and not be <br /> reduced to 22 feet as suggested in the plans. <br /> City Engineer Brown stated that the City is building a 24 feet wide street if you include the two <br /> feet used for curbing. City staff is comfortable that the proposed dimensions will not impede the <br /> snow plows or truck traffic. <br /> Councilmember Larson said that the City has a standard of 24 foot wide streets; we should <br /> attempt to make the roads this size. <br /> City Engineer Brown said that the following two streets arc not scheduled to be 24 feet wide: <br /> . Arden Place; <br /> . Siems Court. <br /> Members of the City Council were in agreement that the streets width should be 22 foot face to <br /> face 0 f the curb. <br /> C. Siems Court Wall Option- <br /> City Engineer Brown stated that the City's objective is to lower the driveways and re-grade the <br /> area to improve water drainage issues. The proposed project will include the reconstruction of a <br /> few residential driveways and the removal of a few trees. City staff does not recommend <br /> . rebuilding the retaining wall at this time. <br />