Laserfiche WebLink
F H A S'_ III Ulr , 1975 <br />A. Put in asphalt_ play area . ( Completed Fall 1975) <br />410 <br />B . Start around cover on border or located wood chips. <br />C . Improve drainage: situation. (completed Summer 1975) <br />D. Build sand pit using railroad ties. (completed Fall 1975) <br />E . Order equipment . (Completed Spring 1975) <br />PEAT': IV: -'ALL, 1975 <br />A. Install backboard . <br />3. Install climbing structure . (Completed Fall , 1975) <br />C . Build bridge between play areas over drainage ditch if necessary. <br />D. Install picnic tables, benches, etc. <br />Tr S- Ti 197E <br />A . Replace any trees and shrubs that have died in initial planting . <br />IPB . .Clean up border and park using neighborh-ood help. <br />C . Shape and plant the back berm; add front berm and plantincs. <br />D. Install Park Sion . <br />New plantings should be watched for dryness during initial year, but <br />border is designed to become essentially care free after it sets coina .