My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
12-09-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:31:34 PM
Creation date
12/17/2024 2:11:41 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. The Developer shall post a $2,500.00 security for the re -setting of any iron <br />monuments that may be disturbed during the site grading and utility construction. <br />E. The Developer shall pay the cost for the preparation of record construction <br />drawings and City base map upgrading by the City Engineer as part of the Administrative / <br />Engineering Fee. <br />F. The Developer must obtain a sign permit from the City prior to installation <br />of any signs for the development. <br />G. Prior to the issuance of a land disturbance permit, the Developer shall <br />submit an operation and maintenance plan for the long-term care of all on -site stormwater, and <br />sanitary sewer facilities to the City for review and approval. <br />24. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the <br />cash requirements under this Agreement which must be furnished to the City prior to issuance of <br />any development permits and execution of this Agreement by the City: <br />Engineering, City Administration <br />City Engineering escrow $10,000.00 <br />Lot Corner/Iron Monuments $2,500.00 <br />Total Cash Requirements $12,500.00 <br />The City is implementing a pass through billing process. The $12,500.00 escrow will be held and <br />all bills will be forwarded for immediate payment. If payments are not made in a timely fashion, <br />the project will stop until payments are made. If said fees are less than estimated, the City shall <br />reimburse the Developer within thirty (30) days of receipt of final invoices. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.