My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
12-09-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:31:34 PM
Creation date
12/17/2024 2:11:41 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for design changes and contract administration between the Developer and the Developer's <br />contractor. The Developer or Developer's engineer shall schedule a pre -construction meeting at a <br />mutually agreeable time at Arden Hills City Hall, or location designated by City staff, with all <br />parties concerned, including City staff, to review the program for the construction work. If <br />applicable, the Developer will install sidewalks just prior to the installation of the final lift of <br />asphalt. <br />9. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and <br />construction required by this Agreement, the sidewalk and related Improvements lying within <br />public easements shall become City property without further notice or action. Upon completion <br />of the public improvements, the City shall inspect the public improvements and notify Developer <br />if any of the improvements do not conform to the requirements of this Agreement. Upon <br />compliance with this Agreement with respect to public improvements, the City shall give formal <br />notice of acceptance to Developer and thereafter Developer shall have no responsibility with <br />respect to the maintenance of the public improvements, except during any warranty periods. <br />10. WARRANTY. The Developer warrants the sidewalk and related public <br />improvements required to be constructed by it pursuant to this Agreement for a period of twenty- <br />four (24) months from the date of acceptance by the City against poor material and faulty <br />workmanship. Any trees and shrubs that are public improvements shall be warranted to be alive, <br />of good quality, and disease free for twenty-four (24) months after planting. Any replacements <br />shall be warranted for twenty-four (24) months from the time of planting. <br />11. IRON MONUMENTS. If any survey/plat monuments are disturbed during <br />construction of the Development, the Developer's surveyor shall submit a written notice to the <br />City certifying that such monuments have been reinstalled. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.