My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 03-29-2004
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2004
>
CC 03-29-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:22 PM
Creation date
11/9/2006 1:27:33 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS REGULAR CITY COUNCIL MEETING MINUTES <br />MARCH 29, 2004 <br /> <br />6 <br /> <br />. <br /> <br />MOTION: Councilmember Holden moved and Councilmember Grant seconded a <br />motion to approve Planning Case 04-06: MSP Commercial, 3130 <br />Cleveland Avenue; Master and Final Planned Unit Development (PUD) <br />with the conditions as noted in staff's March 29, 2004 report. The motion <br />carried unanimously (4-1) (Councilmember Larson). <br /> <br />c. <br /> <br />PLANNING CASE 04-02: <br />SPECIAL USE PERMIT <br />SOPHOMORE DORM <br /> <br />BETHEL COLLEGE; 3900 BETHEL DRIVE; <br />(SUP) MASTER PLAN AMENDMENT; NEW <br /> <br />Mr. Hellegers stated the applicant was requesting approval of an amendment to their Special <br />Use Pennit (SUP) Master Plan, a Site Plan review, and height variances to allow for the <br />construction of a new 4-story dormitory on the northeast portion of the campus. <br /> <br />Mr. Hellegers indicated subsequent to the Planning Commission meeting, the applicant <br />submitted a revised planting schedule which included additional caliper inches of trees. The total <br />caliper inches on the revised planting schedule include some of the plant materials currently on <br />site. This is consistent with the requirements for landscape plans. He noted while the total <br />caliper inches had been increased to meet the City's overall caliper inch standards, the minimum <br />. percentages oftrees in various size ranges do not meet the City's standards. <br /> <br />Mr. Hellegers stated the Planning Commission reviewed this case and recommended approval <br />subject to the following conditions: <br /> <br />. <br /> <br />I. The applicant shall continue to abide by the conditions of approval as stated in the <br />approved Special Use Permit (SUP) and Master Plan and subsequent SUP <br />Amendments. <br />2. The applicant shall permanently maintain a 60-foot clearance around the entire <br />building. <br />3. Building Permit Plans shall be submitted to the Building Official a minimum of two <br />(2) weeks before the planned start of construction. <br />4. No construction shall begin before plans are approved by the City of Arden Hills' <br />Building Official. <br />5. Revised utility, grading, drainage, and erosion control plans shall be submitted to the <br />City Engineer for approval prior to the issuance of a building pennit. <br />6. Standpipes shall be required in the proposed dormitory. <br />7. The applicant shall verify the location ofthe F.D.C. <br />8. The F.D.C. shall be located within 150 feet ofa fire hydrant. <br />9. The applicant shall submit a landscape performance bond or other surety for 125% of <br />the cost of materials and installation valid one full year from the date of installation <br />prior to the issuance of a building permit. <br />10. The applicant shall submit a revised landscape plan and planting schedule to comply <br />with city landscape standards which shall require approval of the City Planner prior to <br />the issuance of building permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.