Laserfiche WebLink
<br /> ARDEN HILLS CITY COUNCIL WORKSESSION <br /> SEPTEMBER 15,2003 3 <br /> . of Arden Hills. Chief Boehlke said the need and hope of the LJVFD to take <br /> delivery on a new engine with a 75-foot ladder needed at Station One was for year <br /> 2009, replacing Engine 762 in 2011 or 2012. Lastly, Chief Boehlke said Station <br /> One was built in 1946 and had become a proverbial "money pit", noting a fire <br /> station should be located closer to more affordable housing locations in the City. <br /> Chief Boehlke also presented a truck rebuild/replacement plan which illustrated <br /> vehicle types, life and rebuild plan. His recommendation was to eliminate truck <br /> rebuilds due to the dramatic increases costs based upon the new truck technology <br /> and safety features. He noted the long term planning for the LNFD was for a 30- <br /> year period, although not fine-tuned. <br /> Councilmember Larson said although the current [LJVFD] budget may seem a bit <br /> ambitious, he has noted significant improvements in the department. <br /> Mayor Aplikowski thanked Chief Boehlke, Deputy Chief Adair and District Chief <br /> Jensen and she recommended a public commendation to the LJVFD occur at an <br /> October 2003 City Council meeting. <br /> . Ramsev County Transportation: Lexinl?:ton A venue Reconstruction <br /> Discussion <br /> Mr. Jim Tolaas, Ramsey County, presented a graphic representation of the <br /> Lexington A venue reconstruction from Victoria A venue to County Road 96, which <br /> indicated a 5-lane facility with a continuous left turn lane. He noted Shoreview <br /> requested an 8-foot path on the east side of the roadway. He said right turn lanes <br /> into Karth Lake East neighborhood are included in the plan. He noted that in the <br /> past, those residents of the Karth Lake East neighborhood indicated the desire to <br /> have a signal placed at Amble Road. In terms of cost, several features of <br /> reconstruction will not be the responsibility of the City. However, the right-of-way <br /> acquisition will involve some cost to Arden Hills. He noted Shoreview had <br /> requested a continuous median along the roadway. He mentioned Shoreview <br /> Mayor Sandy Martin suggested a joint Arden Hills/Shoreview meeting to discuss <br /> the project. He noted the project timeline was one year from start to completion <br /> occurring before the winter of2006. <br /> Councilmember Larson asked if the problem for those residents entering and <br /> . exiting Lexington Avenue would be somewhat remedied with the completion of <br /> the reconstruction project. <br />