Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - SEPTEMBER 25, 2000 <br /> <br />2 <br /> <br />There were no public comments, <br /> <br />UNFINISHED AND NEW BUSINESS <br /> <br />Mayor Probst noted that a discussion regarding plans for the Ingerson Neighborhood, previously <br />scheduled for this evening's meeting, had been postponed to the October 10 regular Council <br />meeting, <br /> <br />A. Planning Cases <br /> <br />1. Case #00-31, Hood Flexible Packaging, 1887 Gateway Boulevard, Planned Unit <br />Development (PUD) Amendment <br /> <br />Ms, Chaput explained that the applicant is requesting to amend the Planned Unit Development <br />for 1887 Gateway Blvd, to allow the placement of a make-up air unit (~1 T x 5'9") and a chiller <br />condenser (- T x 5 '6") in front of one of the husiness' existing loading doors, <br /> <br />Hood Flexible Packaging came before the City Council with Planning Case #00-17a to request <br />the addition of two exterior solvent tanks, a catalytic oxidizer and the expansion of one overhead <br />door to accommodate these additions, This case was approved with the following conditions: <br /> <br />1, A minimum of three protective bollards he placed to protect the fence structure, <br />2, The dock door closest to the oxidizer not be used once the oxidizer is in place, <br />3, Solvent tank and oxidizer screening be cedar wood construction, painted to match the <br />building, <br />4, All rooftop mechanical devices he screened per code requirements, <br />5, Solvent tank placement meet building/fire code regulations, <br />6, No detectable odors from the printing process be present on the exterior of the building, <br /> <br />Planner Chaput stated that the proposed make-up air unit is required for the operation of Hood <br />Flexible Packaging to bring warm air into the building in the wintertime to equalize airflow, A <br />lot of air is exhausted out of the building and air must be returned to the building so that negative <br />air pressure is not created, It would be difficult to open doors or efficiently dry printed materials <br />without it This would be located directly in front of one of the dock doors so the loading dock <br />would no longer be utilized, <br /> <br />The chiller condenser is also required to chill water that in turn cools down presses and <br />machinery for the operation of the business, This would be placcd to the south of the make-up <br />air unit along the huilding, <br /> <br />Section VI, E, 4, j of the Zoning Ordinance requires that, "Screening shall also be provided <br />where mechanical operating equipment is located on the ground or on the roof of the <br />premises, , ,constructed and located to prevent direct view of the equipment", Screening types <br />may be a fence, wall or landscaping area, It is the property owner's responsibility to provide <br />screening, as required, <br />