My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-007
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
2020-2029
>
2025
>
2025-007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2025 1:24:13 PM
Creation date
2/7/2025 1:24:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />16. All light poles, including base, shall be a maximum of 25 feet in height and shall be shoebox <br />style, downward directed, with high-pressure sodium lamps or LED and flush lenses. <br />17. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />18. A separate sign permit shall be required for all signs on the site. <br />19. Any future trash enclosures shall utilize gates and be constructed on three sides using the <br />same materials and patterns used on the building. Locations shall be approved by the <br />Planning Department. <br />20. The Applicant shall be financially responsible for all applicable water and sanitary charges. <br />Rates applied shall be memorialized in the Development Agreement. <br />21. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, <br />shall be sodded or seeded and maintained. The property owner shall mow and maintain all <br />site boulevards to the curb line of the public streets. <br />22. A right-of-way permit shall be required for work performed within the City and/or Ramsey <br />County right-of-way. <br />23. The Applicant shall provide the City an executed copy of the shared access agreement with <br />North Heights Lutheran Church for the Subject Property that shall be reviewed by the City <br />Attorney and recorded as part of the Development Agreement. <br />24. All items identified in the November 20, 2024, PW/Engineering Division memo shall be <br />addressed. All comments shall be adopted herein by reference. <br />25. The proposed structure shall conform to all other regulations in the City Code. <br />26. Residential dedication shall be a cash contribution in lieu of land and calculated based upon <br />the fair market value of Lot 1, Block 1, as determined by an appraisal submitted to the City <br />by the Applicant and paid for by the Applicant. Said appraisal must be made by an appraiser <br />who is an approved member of the SREA or MAI, or equivalent real estate appraisal <br />societies. <br />27. Park Development shall be a cash contribution in lieu of land and calculated using the <br />current per unit fee of $6,500, for a total park development fee of $773,500.00 based upon <br />119 units. <br />28. The Applicant shall install at their expense a trail along Snelling Avenue and within Snelling <br />Avenue right-of-way, adjacent to the Subject Property, which shall be approximately 1,373 <br />feet in length to serve as a connection to Royal Hills Park and consistent with City Code <br />requirements. The final location and specifications of the trail connections shall be approved <br />by the PW Director/City Engineer and Community Development Director. <br />29. The Applicant shall install a trail along Snelling Avenue and within Snelling Avenue right- <br />of-way, adjacent to Ramsey County PID 213023110007, which shall be approximately 396 <br />feet in length to serve as a connection to Royal Hills Park and consistent with City Code <br />requirements. The final location and specifications of the trail connections shall be approved <br />by the PW Director/City Engineer and Community Development Director. The costs <br />incurred to the Applicant for the installation of the approximately 396 foot long trail may be <br />deducted from the Applicant’s park development fee. <br />30. The Applicant shall install 4 electric vehicle charging outlets on the Subject Property. <br />31. The Applicant shall reserve an exterior area of no less than 12 feet by 12 feet, upon which <br />Applicant will install a play structure. The location and specification of the play structure is <br />subject to approval by the PW Director/City Engineer and Community Development <br />Director. <br />32. Applicant shall provide a Security Plan to the City, which must be reviewed and approved <br />by the Ramsey County Sheriff’s Office.
The URL can be used to link to this page
Your browser does not support the video tag.