Laserfiche WebLink
Page 3 of 2 <br /> <br />structures have been ordered and prices locked in from the vendors per Council <br />direction in line with the survey results from resident users. <br />Next steps are: <br />o March 2025 - Award construction contract to the low bid contractor <br />o Summer/Fall 2025 – Construction <br />