Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - APRIL 26,1999 <br /> <br />o <br />,) <br /> <br />Mr, Fritsinger advised that the City Council was asked to provide direction on the proposed <br />changes in the scope of the program for audio/visual services. He invited Electronic Interiors, <br />Inc" representative, Mr, Dickson Stewart, to provide any additional information he may have. <br /> <br />Mr. Stewart pointed out that Electronic Interiors is a consultant, not the supplier or vendor of any <br />products. Electronic Interiors does not receive any compensation for the specification of any <br />product. <br /> <br />He stated that the audio/visual project started out at approximately $234,000, which was the <br />programming goal, Following meetings with Mayor Probst, Councilmember Aplikowski and <br />City Staff, a design was generated to meet the wish list of the City, This reduced the estimate to <br />approximately $175,000. A list of potential cuts was generated which primarily affect some of <br />the quality and flexibility in areas that will compromise the project the least. The cut backs <br />mostly involved future equipment while still providing an infrastructure which could be built on <br />to in the future when other equipment and funds become available. <br /> <br />There are three major components that make up the $120,000 installed project cost. The audio <br />system will be more sophisticated than the current system to allow the audience to hear the <br />meetings better. The audio system will also allow for the taping of the meetings. The cable cast <br />system will involve two cameras, with the capability of adding a third camera in the future, The <br />third major component is the presentation system. The current presentation system consists of an <br />overhead projector. The proposed system would involve an overhead electronic camera to cover <br />material, a VCR and the capabilities of a laptop or multimedia personal computer. This will <br />allow direct broadcast to the viewers at home, <br /> <br />Small monitors had been proposed for the dais to allow the Council to view the rear screen from <br />the dais, It was suggested that these monitors be eliminated at the dais as a cost savings measure. <br />This will allow use of the rear screen and the possibility of installing the monitors at a later date. <br /> <br />There is no plan to cut any infrastructure out of the building itself that would prevent installation <br />of the items being cut from the current project. <br /> <br />Mr. Stewart indicated that if the Council is looking for a budget reduction beyond the estimated <br />$120,000, the only additional item he would suggest cutting would be the overhead document <br />camera, This camera allows a drawing to be placed on the lectern and automatically be picked <br />up on the camera on the ceiling and projected to the view screen, Eliminating this camera would <br />save $8,000; however, it would cut deeply into the capabilities of the system, <br /> <br />Any further reductions in the budget would require the elimination of an entire system in order to <br />save a significant amount of money. Reductions of this magnitude would make the system <br />dysfunctional, difficult to use, and would likely cause frustration. <br /> <br />Mayor Probst asked where the proposed cameras would be located. Mr. Stewart stated that one <br />camera would be behind the Council to mm the audience and the lectern, Another camera would <br />be located near the entry door. The third camera, located in the corner, would be a future <br />addition. <br />