My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 04-26-1999
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1999
>
CC 04-26-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:39 PM
Creation date
11/9/2006 2:38:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - APRIL 26, 1999 <br /> <br />6 <br /> <br />correspondence will be electronic and having the infrastructure in place to accommodate future <br />enhancements is important. <br /> <br />Mr. Fritsinger stated that staff had tried to keep in mind the potential changes in the <br />Councilmembers in the future. New Councilmembers may want a system design that is totally <br />different than what is wanted by the current City Council. Therefore, the design needs to be as <br />flexible as possible to allow for future changes. Although the monitors at the dais are being <br />removed, the spaces for them are remaining to allow for them to be added. <br /> <br />Mr, Fritsinger reiterated that, in order to bring the budget down further, major technology would <br />have to be eliminated. Councilmember Aplikowski noted that it would cost the City additional <br />money in the long run to redesign the system for the future needs, <br /> <br />Mr. Fritsinger suggested a different sort of presentation be made to the City Council at a future <br />Workshop relating to the actual technology in order to provide the Councilmembers with a better <br />understanding of how the system works, He indicated that the letter presented this evening was <br />primarily to provide a budget breakdown of the proposed cuts. <br /> <br />Councilmember Larson asked what type of camera is currently used in the Council chambers. <br />Mr. Stewart stated that the current camera is a one-chip. Councilmember Larson asked what the <br />cost difference is between a one-chip and a three-chip camera. Mr. Stewart stated that there is an <br />approximate $1,500 to $2,000 difference in the price of the cameras. <br /> <br />Council member Larson stated that he had been expecting a larger cut in the project cost. He still <br />does not feel comfortable with the projected cost of $120,000. He indicated that he did not <br />disagree with the importance of the overhead camera, However, the City is building a new City <br />Hall and Council chambers and the Councilmembers do not havc a feel for how the equipment <br />will work once it is installed. He would prefer for the audio/visual program to occur in stages. <br />This would allow the City to utilize the new building \'lith the basic equipment installed and, <br />overtime, decide what additional equipment is really needed. He would not want to see the City <br />spending money on equipment that ends up not being used, <br /> <br />Mr, Stewart stated that it would be possible to demonstrate what the $120,000 worth of <br />equipment will do by visiting other cities and viewing their equipment. He noted that the <br />cquipment being used by the other cities might not specifically address what the City of Arden <br />Hills wants. He stated that, if the City wants the budget to be below $100,000, it would end up <br />with a system it does not want. Because the audio and cable systems are necessary the only other <br />large cut he would suggest would be the presentation system. Ifthe presentation system were cut <br />in its entirety, it would reduce the budget by approximately $40,000. <br /> <br />Based on the concerns of Council members Larson and Malone, Mr. Fritsinger suggested that <br />staff and Electronic Interiors put together a more descriptive summary of what is included in the <br />$120,000 package, The summary may provide a better understanding of how any additional cuts <br />would affect the system. Mayor Probst asked when the Council should review the additional <br />information, Mr. Fritsinger stated that he would have to check the schedules, however, he <br />suggested discussing the issue at either the next Worksession or Council meeting. He noted the <br />
The URL can be used to link to this page
Your browser does not support the video tag.