Laserfiche WebLink
2 of 4 <br /> <br />West Quarter-section corner thereof; thence continuing on the same course a distance of two thousand six hundred <br />twenty-five and eight-tenths (2625.8) feet to a stake on the West line of Section Thirty-three (33), three hundred <br />sixty-three and eight-tenths (363.8) feet north of the Southwest corner thereof; <br /> <br />Excepting therefrom, that part of said fifty (50) foot strip of land lying north of the Soo Line Railway Company <br />Right-of-Way, all in the Southeast Quarter (SE¼) of Section Twenty-eight (28), Township Thirty (30) North, Range <br />Twenty-three (23) West. <br /> <br /> <br /> WHEREAS, Requestor has applied to Xcel Energy for permission to use a portion of the Easement for Public <br />Utilities purposes, hereinafter reffered to as (the “Easement Area”). The Easement Area affected by this Consent is <br />shown on Exhibit “B”, attached hereto. <br /> <br /> NOW THEREFORE, in consideration of the promises exchanged herein, the parties for themselves and their <br />respective successors and assigns agree as follows: <br /> <br />1. Xcel Energy consents to Requestor’s use of the Easement Area for the purposes described in Exhibit “A”, <br />attached hereto and made a part hereof, subject to Requestor’s strict compliance with the terms set forth herein. <br /> <br />2. The Requestor acknowledges that it has inspected the Easement Area and determined it to be suitable for the <br />uses described in Paragraph 1 above. Requestor agrees that it is not relying on any oral or written representation <br />of Xcel Energy concerning the Easement Area (including but not limited to dimensions, soil conditions, <br />environmental conditions, and municipal restrictions, or use by adjoining or third parties). <br /> <br />3. No future work shall be conducted on the Easement Area until Requestor has received written approval from <br />Xcel Energy. As a condition to approval, Requestor shall submit detailed plans of the work and a description of <br />work procedures. Xcel Energy’s approval of any work or work procedures merely indicates its consent to the <br />proposed activities and does not constitute a representation or warranty concerning the suitability, prudency, <br />effectiveness, or propriety of the proposed activities. <br /> <br />4. Requestor agrees that within thirty (30) days of Xcel Energy’s submittal of an invoice, Requestor shall <br />reimburse Xcel Energy for its reasonable expenses to review any request for work (including but not limited to <br />costs for administrative review, engineering and field inspection). <br /> <br />5. Prior to commencing work, Requestor shall designate a representative who will supervise the work, be present <br />during all work, and be authorized to control and, if necessary, suspend the work. <br /> <br />6. Requestor shall immediately suspend its work if requested by Xcel Energy. If suspension is required due to <br />Requestor’s failure to strictly comply with the terms of this Consent, upon such suspension the parties shall <br />consult in an effort to cure such noncompliance so that the Requestor may resume its activities. <br /> <br />7. Requestor shall not at any time use or store any pollutant or hazardous material within the Easement Area, and <br />shall at all times maintain the Easement Area in a safe and lawful condition. <br /> <br />8. Requestor shall, at its sole cost and risk, obtain all permits, consents or approvals required for its occupancy and <br />use of the Easement Area. Upon Xcel Energy’s request, Requestor shall provide evidence reasonably <br />satisfactory to Xcel Energy that all required consents or permits are in force for Requestor’s use of the Easement <br />Area. <br /> <br />9. As part of Xcel Energy’s business operations, Xcel Energy shall have the right, at any time and without liability <br />or compensation to Requestor, to use the Easement Area to install, use, repair, maintain, relocate or remove <br />facilities that presently exist or may in the future be located within the Easement Area. <br />