My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />The OSHA requirements in this section must be included on the plan sets and specifications given to contractors. <br />(5) Building on easements. <br /> There shall be no additional permanent or temporary buildings allowed within the easement area, without prior <br />written approval from Xcel Energy. <br />(6) Fuel and refueling on easements. <br /> There shall be no fuel tanks stored or refueling of vehicles and equipment within the easement. <br />(7) Streetlights and signs on easements. <br /> If there are to be streetlights, signboards, identification signs or any other type of non-building structure within the <br />easement, detailed plans must be submitted to Xcel Energy prior to construction for review and approval to verify <br />compliance with electrical code clearances prior to construction start. <br />Metallic structures must be properly grounded. The same working clearance criteria as stated in paragraph (4) also <br />applies, for equipment used to erect and install light standards, sign boards, etc. Any metallic structure, pole, wire <br />or item placed in the vicinity of a high-voltage transmission line will have the potential to become electrically charged <br />due to electrical induction. The development of an electric charge results in a potential difference between the metal <br />installation and the ground, which can result in electrical shocks when the item is touched. Placement of such metallic <br />installation should take into consideration the shock potential during the; construction, intended use AND future <br />maintenance activities. Items which become charged must be connected to a grounding rod or grounding system to <br />prevent shocks. <br />(8) Notification. <br /> <br />Prior to the start of construction and following project completion, the requestor or contractor must notify Xcel <br />Energy. Please contact Seth Wight at (612) 342-8926, or by email at seth.j.wight@xcelenergy.com <br /> <br />It is the express condition of this consent that all other terms and conditions of that certain easement shall remain in full force <br />and effect. <br /> <br />NOTICE REGARDING LIMITATION OF LIABILITY: Requester understands and agrees that pursuant to the <br />foregoing consent provisions, Xcel Energy is not liable for any damages it or any other party may cause to the improvements <br />authorized herein. <br /> <br />(Line 0803: Str’s 53-58) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.