My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW 2025-03 Page 2 of 5 <br /> <br />2.2. The County will prepare an abstract of bids and a cost participation summary <br />based on the lowest responsible bidder’s proposal, and will provide the same to <br />the City. <br /> <br />2.3. The County will request the City’s concurrence to award a contract to the lowest <br />responsible bidder. <br /> <br />2.4. The County will award a contract, and pay the contractor from the State Sales <br />Tax, and local funds identified for the Project. <br />3. Responsibility for Construction Engineering <br />3.1. The County shall perform or contract the performance of the construction <br />engineering for all elements of the Project at no cost to the City <br /> <br /> <br />4. Project Costs <br />4.1. A list of the construction pay items and percentages of City funding responsibility <br />as well as the total estimated City Project cost is attached as Attachment B. <br />Quantities and unit prices in Attachment B are estimates. Actual costs shall be <br />based on the contract unit prices and the quantities constructed. <br /> <br /> <br />4.2. Design Engineering Costs <br /> <br />4.2.1. The County will cover all design engineering fees for this project. <br /> <br />4.3. Construction Engineering Costs <br />4.3.1. The City shall pay the County a construction engineering fee equal to <br />12% of the City’s share of the items identified in Attachment B. <br /> <br />4.3.2. Construction engineering shall be calculated based on the final contract <br />quantities and unit prices. <br />5. Payment Schedule <br /> <br /> <br />5.1. The County will invoice the City for construction costs incurred on a monthly <br />basis or as determined by the payment schedule for the contractor. <br /> <br />5.2. Construction engineering will be invoiced at the time of substantial project <br />completion, as determined by the County. <br /> <br />5.3. Payment will be made within 30 days of receipt of an invoice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.