My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 09-13-1999
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1999
>
CC 09-13-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:41 PM
Creation date
11/9/2006 2:39:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS CITY COUNCIL - SEPTEMBER 13, 1999 <br /> <br />6 <br /> <br />B. <br /> <br />Resolution #99-27, Receive Bids, 1999 Storm Water Management Utility Ditch <br />Cleaning Project (Base Bid) and Arden Manor Park Improvements (Alternate) <br /> <br />. <br /> <br />Mr. Brown explained that bids were received and opened for the McClung Drive Drainage <br />Improvements and Arden Manor Park Improvement projects on September 8, 1999. Bids were <br />received from two contractors. Both bids had proper bid guarantees in the amount often percent <br />as required. The bids ranged from $158,617.45 to $181,930.75. Nadeau Utility, Inc. was the low <br />bid at $6,400 below the Engineer's estimate and reflected a reasonable price for the work. <br /> <br />The City Engineer has had no direct experience working with Nadeau Utility, Inc. or the <br />proposed subcontractors. However, other project managers at BRW have had experience with <br />the contractor and have indicated that the projects required above average oversight on the part of <br />the Owner/Engineer, but that the final projects were completed satisfactorily. <br /> <br />The work included in these projects would not be particularly difficult, although the McClung <br />Drive work was located within several private properties and will require significant coordination <br />with residents and attention to detail with regard to final restoration of the project site. Based <br />upon the type of work included in the project and comments from other BRW staff, it was the <br />opinion of the City Engineer that Nadeau Utility, Inc. would be capable of completing the project <br />satisfactorily. <br /> <br />. <br /> <br />The Base Bid amount for was for work associated with the McClung Drive Drainage <br />Improvements Project. The Bid Alternative #1 amount was for work associated with the Arden <br />Manor Park Improvements. If the Council elected to only award the Base Bid for the McClung <br />Drive Drainage Improvements, the total contract amount would be $31,916.50. <br /> <br />The tentative schedule would begin the project on September 20, ] 999 with the McClung Drive <br />Drainage Improvements being completed October I, 1999 and the Arden Manor Park <br />Improvements being completed on November ]5, 1999. <br /> <br />Mr. Brown advised that staff recommends the City Council award the 1999 Storm Water <br />Management Utility Ditch Cleaning Project (Base Bid) and Arden Manor Park Improvements <br />(Alternate) to Nadeau Utility, Inc. for an amonnt not to exceed $158,617.45. <br /> <br />Councilmember Malone noted that Bid Alternative #] for the Arden Manor Park would be <br />dependent upon the decision made in agenda item 7C, Conveyance of Property from the Arden <br />Manor Mobi]e Home Park. He suggested that the Base Bid be awarded as a separate motion <br />from Bid Alternate # 1, the Arden Manor Park Improvements. The City Council concurred. <br /> <br />Councilmember Malone moved and Councilmember Aplikowski seconded a <br />motion to approve Reso]ution #99-27, Part A, awarding the 1999 Storm Water <br />Management Utility Ditch Cleaning Project (Base Bid) to Nadeau Utility, Inc. for <br />an amount not to exceed $3] ,916.50. <br /> <br />. Councilmember Larson noted that Mr. Brown had indicated little experience with Nadeau <br />Utility, Inc. Additionally, other BRW staff had indicated the contractor required above average <br /> <br />MOTION: <br />
The URL can be used to link to this page
Your browser does not support the video tag.