Laserfiche WebLink
<br /> ARDEN HILLS eITY eOUNeIL WORKSESSION - SEPTEMBER 20,1999 4 <br />. <br /> Mr. Sand made the Council aware of yet another offer to purchase Meredith Cable (MediaOne) <br /> by AT & T. The Cable Commission was still reviewing a proposed Transfer of Ownership, <br /> which it needed to respond to by November 15, 1999. <br /> Mr. Sand presented a copy of September 1, 1999 Notice of Franchise Violation sent to <br /> MediaOne by the Cable Commission addressing current customer complaints being experienced <br /> with MediaOne, cable provider for the City. <br /> Discussion included Mr. Post's attendance and involvement with the Commission's <br /> Telecommunications Advisory Meeting; the proposed 2000 Commission budget and proposed <br /> use of reserves and capital expenditures; the Council's need for input on the budget as it relates <br /> to the City's franchise agreement; future markcting for the Roadrunner product; and the City's <br /> current cable capabilities for resident information. <br /> b. Old Hie:hwav 10 Water Main Extension Petition Discussion <br /> Mr. Post and Mr. Stafford reviewed the petition request and discussion ensued more fully on the <br /> issues surrounding this requested water utility capital project. <br />. Mr. Stafford reviewed the history ofthis request, stating that the City Council had originally <br /> considered, in 1996, installation of a segment of water line on Old Highway 10, south of <br /> Highway 96 to Wedgewood Circle. Due to higher than expected bids received for the project in <br /> 1996, and the limited resident support of this project, the Council rejected all bids. This area <br /> remains the only developed area of the City not served by City water and affects approximately <br /> sixteen (16) properties. <br /> Discussion included the City's existing assessment policy and the ramifications to the <br /> neighborhood; possible proportionate funding from the water utility; estimated cost of the project <br /> by Consulting Engineer, Greg Brown, at an estimated $125,000 total bid out with hydrants and <br /> fittings (or $25.00/foot); <br /> Mr. Stafford noted that the originator ofthe petition was not a resident, but has three <br /> undeveloped lots and is apparently interested in marketing them, following availability of city <br /> services. Mr. Stafford also questioned whether or not this could be considered as an internal <br /> project by City staff. <br /> Engineering and construction concerns included the size of main to be installed; additional cost <br /> to homeowners of driveway cuts, and service connections; cathodic protection due to the acidic <br /> soils in tile area or the need for plastic piping; potential assessment of $6 - 8,000 per property; <br /> the requirement for residents to pay for their portion of the main and service, but not needing to <br /> hook up at this time if they wanted to continue using private wells; and consideration of any <br /> assessment deferral. <br />. <br />