Laserfiche WebLink
<br /> ARDEN HILLS CITY COUNCIL - OCTOBER 25, 1999 17 <br /> . Mr. Post pointed out that this building is different than the other two built on this street in that <br /> the building was built for multiple tenants. The Apache Group bought this building and is the <br /> primary tenant, thus there is a need for greater exposure. <br /> MOTION: Councilmember Larson moved and Councilmember Aplikowski seconded a <br /> motion to approve Planning Case #99-20, Planned Unit Development <br /> Amendment, to allow for a 60 square foot sign on the south side of the building <br /> located at 1787 Gateway Boulevard, and that the applicant be allowed one free <br /> standing sign and two wall signs, which are 60 square feet in area, at each <br /> entryway to the building for a total of 480 square feet of signage on the building, <br /> which is less than 10 percent of the building facade as required by the Sign <br /> Ordinance. The motion carried unanimously (4-0). <br /> 5. Case #99-21, Pacesetter Corporation, 2015 Gateway Boulevard, Planned Unit <br /> Development Amendment <br /> Ms. Randall explained that the applicant was requesting approval of an amendment to the <br /> planned unit development to place a trash compactor at 2015 Gateway Boulevard, <br /> On July 14, 1997, the City Council approved Planning Case #97-06 for the construction of three <br /> officelindustrial buildings. The Zoning Ordinance requires that all exterior storage shall be <br /> . screened from public view. The site plan did not provide for any trash enclosures, The trash <br /> compactor will be visible from Round Lake Court The applicant has been using a trash <br /> dumpster located in the loading dock area. Several other tenants have been doing the same. <br /> Due to the number of pick-ups required, the applicant would like to have a compactor to reduce <br /> the number of trash pickups. The trash compactor is slightly larger than a trash dumpster and <br /> looks much the same. The compactor will be 10 feet high, approximately 10 feet wide, and a <br /> total of30 feet long. It will be located approximately 10 feet from the building and three feet <br /> from the transformer. They are proposing to locate the compactor in front of a transformer with <br /> the required three foot setback from the transformer. The trash compactor would not extend any <br /> further than the trucks that will be located in the area. <br /> Staff recommended screening be added on the west side of the compactor unit The applicant has <br /> agreed to this requirement However, the applicant has noted that there are other trash dumpsters <br /> in the area. The applicant has also expressed concern that the trash compactor must be accessible <br /> from one side for daily pickups, The applicant did not object to screening on the west side. <br /> Ms, Randall advised that the Planning Commission recommended approval of Planning Case <br /> #99-21, Plmmed Unit Development Amendment, to allow for a trash compactor and dumpster on <br /> the north side of the building located at 2015 Gateway Boulevard, with the condition that a wood <br /> fence to match the building be placed on the west side of the trash dumpster and compactor. <br /> . Upon reviewing the recommendation by the Planning Commission, Ms, Randall stated that the <br /> applicant felt that the wood fence would be difficult to maintain, The applicant has considered a <br />