My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-2025 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
04-07-2025 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 4:19:45 PM
Creation date
4/9/2025 4:19:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />E-2 <br />TW185\1\1011577.v13 <br /> <br />C. The Owner is proceeding to build on and develop the Owner Property, and has <br />requested approval of a Site Plan for the proposed development at Lot 1, Block 1, Rice Creek Commons; <br />and <br /> <br />D. The site plan application includes for the stormwater management facilities to be <br />constructed by the Owner to serve the Owner Property and to be located on the County Property; and <br /> <br />E. The Owner has provided plans for construction of certain infrastructure to manage the <br />stormwater (the “Plans”); and <br /> <br />F. The Plans, which are expressly made a part hereof, as approved or to be approved by <br />the City, provide for conveyance, piping, detention and infiltration stormwater facilities (collectively <br />“Stormwater Facilities”) and as generally depicted on Exhibit A attached hereto; and <br /> <br />G. The City, the Owner, and the County agree that the health, safety, and welfare of the <br />residents of the City of Arden Hills, Minnesota, require that on-site stormwater management facilities <br />be constructed and maintained; and <br /> <br />H. The City requires that the Stormwater Facilities as shown on the Plans be constructed <br />and adequately maintained and repaired by the Owner as a condition of final approval of the Plans. <br /> <br />NOW, THEREFORE, in consideration of mutual covenants of the parties set forth herein and <br />other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties <br />agree as follows: <br />1. Construction of Stormwater Facilities. Owner shall construct, inspect and maintain <br />the Stormwater Facilities in accordance with the approved plans and specifications identified in the Plan. <br />Inspection shall be performed by a City approved or appointed engineering consultant, including weekly <br />inspection reports. <br /> <br />2. Maintenance of Stormwater Facilities. <br /> <br />A. The Owner shall adequately maintain the Stormwater Facilities in accordance with the <br />Stormwater Maintenance Plan for stormwater treatment facilities attached hereto as Exhibit B and City <br />engineering standards. This includes all pipes, channels, and other conveyances built to convey <br />stormwater for the facility, as well as all structures, improvements, and vegetation provided to control <br />the quantity and quality of the stormwater. Adequate maintenance is herein defined as good working <br />condition so that these facilities are performing their design functions for the life of the system. <br /> <br />B. The Owner will perform the work necessary to keep these Stormwater Facilities in <br />good working order as appropriate. Inspection, reporting and maintenance of the Stormwater Facilities <br />shall conform to the BMP Maintenance Requirements, included in the attached Exhibit B. The schedule <br />will be followed and comply with all federal, state, and local regulations relating to the disposal of <br />material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.