Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - FEBRUARY 10.1997 <br /> <br />6 <br /> <br />B. <br /> <br />Planning Case #97-03, Cardiac Pacemakers, Inc., 4100 HamIine Avenue, pun <br />Amendment <br /> <br />Mr. Ringwald reviewed for the Council the applicant, Cardiac Pacemakers, Inc., is requesting <br />approval of an amendment to their previously approved Planned Unit Development (PUD) to <br />allow for expansion of Building E at their campus located at 4100 Ham1ine Avenue. <br /> <br />Mr. Ringwald provided an overhead which showed the location of the proposed addition. He <br />stated it would look the same as the rest of the building, and would absorb part of the current <br />skyway system. <br /> <br />Mayor Probst inquired if there would be any changes to the skyway. Mr. Ringwald replied that <br />there would be no changes to that point of the skyway outside ofthe building. <br /> <br />Mayor Probst inquired ifthere would be parking concerns connected with this addition. Mr. <br />Ringwald stated that although there are no parking concerns at the present time, the possibility <br />exists in the future for this company to require construction of a parking ramp due to their rapid <br />expansIOn. <br /> <br />MOTION: <br /> <br />Hicks moved and Aplikowski seconded a motion that the City Council approve <br />Planning Case #97-03, PUD Amendment, per the Planning Commission <br />recommendation. The motion carried unanimously (5-0). <br /> <br />C. Highway 96 <br /> <br />1. Lexington Avenue Intersection Plans/Cost Participation <br />2. Signal Agreement <br /> <br />Dwayne Stafford, Public Works Superintendent, gave an overview of the 1997 Highway 96 <br />reconstruction costs. He stated the segment of Highway 96 from Mackubin Street in Shoreview <br />west to Lexington Avenue was identified as one of the two segments of the highway to be <br />reconstructed in 1997. The Lexington Avenue and Highway 96 intersection will be completed <br />during the reconstruction, including turn lanes, and the roadway to approximately 1380 feet west <br />of Lexington Avenue. This will negate the need to close this intersection during reconstruction <br />of the Arden Hills segment between Lexington Avenue and Highway 10. <br /> <br />Mr. Stafford reported on installation of an EVP System with the new traffic signals at Highway <br />96 and Lexington Avenue. Typically, the County charges the affected cities for this system. <br />This would mean a 50/50 split between Arden Hills and Shoreview. <br /> <br />Mr. Stafford reported that Arden Hills will be responsible for payment of approximately $19,500 <br />in storm sewer construction costs and approximately $5,000 for the EVP System. <br /> <br />Mr. Stafford referred to the two attached Agreements, and requested the City Council authorize <br />the City to enter into these agreements as stated. <br />