Laserfiche WebLink
<br />ARDEN HILLS CITY CmJNCIL - MAY 12. 1997 <br /> <br />5 <br /> <br />. <br /> <br />Councilmember Malone inquired the extent of patching necessary on County Road F. Mr. <br />Stafford replied mainly patching of numerous potholes was needed. <br /> <br />Mr. Fritsinger stated the Resolution does not discuss repairs, and this issue will have to be <br />discussed with the County. <br /> <br />D. Preliminary Gateway Business District Improvements, Feasibility Report Discussion <br /> <br />Mr. Kevin Ringwald, Community Development Director, showed an overhead slide of the <br />Gateway Business District, explaining that Phase I was currently under construction, and Phase <br />II, III, and IV will come before the Planning Commission for discussion on June 18, 1997. <br /> <br />The scope of the feasibility report is for roads and utilities required south of the Indykiewicz <br />parcel and west of the Vaughn parcel. <br /> <br />Mayor Probst inquired if the road and utilities servicing the Vaughn parcel were satisfactory. <br />Mr. Ringwald stated this parcel would be evaluated at a future date, given the existing tower on <br />the property. <br /> <br />Mayor Probst suggested checking the implications regarding utilities for the entire district. <br /> <br />. Mr. Greg Stonehouse, came before the Council to explain the Preliminary Feasibility Study. He <br />reviewed the cost of the study and a schedule of the proposed project. <br /> <br />Mr. Stonehouse showed an overhead slide of the sewer lines, and one of the water mains. He <br />gave a general overview of the work to be completed, including locations where sewer and water <br />pipes would need replacement, and where storm sewers would need to be added. He also <br />discussed drainage, roadway improvements, and trails and sidewalks in the area. He discussed <br />an NSP easement and a U.S. Pipeline easement in the area and how these easements would be <br />handled. <br /> <br />Mr. Stonehouse discussed project costs as broken down into stages, and showed a project <br />schedule. The final plan will be presented to City Council on May 27,1997. <br /> <br />Mayor Probst inquired regarding the schedule of reconstruction as it pertains to the bridge. Mr. <br />Pritsinger indicated the bridge was scheduled for reconstruction in 1999. Mr. Fritsinger also <br />indicated the Feasibility Study will be studied further by the City and staff to address remaining <br />questions and concerns. He indicated the developer had also expressed interest in constructing <br />the road for the City. <br /> <br />Mayor Probst inquired what type of street was planned, and indicated his preference for a <br />boulevard design to allow for more flexibility and aesthetics. He inquired how the Highway 96 <br />project and this project would be coordinated. Mr. Fritsinger indicated a meeting was scheduled <br /> <br />. <br />