My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 07-28-1997
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1997
>
CC 07-28-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:49 PM
Creation date
11/9/2006 3:22:09 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - JULY 28, 1997 <br /> <br />6 <br /> <br />MOTION: <br /> <br />Keim moved and Aplikowski seconded a motion to accept the minutes for the <br />July 14, 1997 Regular Council Meeting and the July 21,1997, Council <br />Worksession as amended. The motion carried unanimously (5-0). <br /> <br />CONSENT CALENDAR <br /> <br />A. Claims and Payroll <br />B. South Water Tower, Order Preparation of Plans and Specifications <br /> <br />MOTION: <br /> <br />Malone moved and Hicks seconded a motion to approve the Consent Calendar as <br />submitted and authorized execution of all necessary documents contained therein. <br />The motion carried unanimously (5-0). <br /> <br />PUBLIC COMMENTS <br /> <br />There were no public comments. <br /> <br />UNFINISHED AND NEW BUSINESS <br /> <br />A. Resolution #97-14b, Revising Resolution #97-14, Final Assessment Roll Resulting from <br />Actual Improvement Footage Measurements, 1519 McClung Avenue <br /> <br />Mr. Fritsinger stated that the above property abutted two streets that were part of the 1997 <br />Pavement Management Program. In the initial preliminary assessment roll, it was assumed that <br />all (100.95 assessable feet) of the improvement would be reconstruction. However, following <br />the initial March 31, 1997 Assessment Hearing, the City's Consulting Engineer, Terry Maurer, <br />re-evaluated the property footage, and determined that a 75% reconstruction (75.71 feet) and <br />25% reclamation (25.24 feet) would be more representative of improvements. <br /> <br />At the present time, with both the McClung Drive and Colleen Avenue improvements well under <br />way, it was possible to determine more precisely the benefit the property was receiving from <br />each of the improvements. On July 15, 1997, the City Engineer informed Staff that actual <br />measurements taken by his firm indicated that only 19.7 feet was benefited by the reconstruction <br />improvement. <br /> <br />The original assessment was for $1,920.52, and the proposed revised assessment was $870.89. <br />Staff rccommends that the City Council adopt Resolution #97-14b to amend the previously <br />adopted street improvement special assessment at 1519 McClung Drive to reflect actual <br />construction activity. <br /> <br />MOTION: <br /> <br />Malone moved and Hicks seconded a motion to adopt Resolution #97-14b. The <br />motion carried unanimously (5-0). <br />
The URL can be used to link to this page
Your browser does not support the video tag.