My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-20-25 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2025
>
05-20-25 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 8:30:26 AM
Creation date
5/15/2025 8:30:12 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />project. Staff reached out to CDBG representatives requesting the status of the program <br />for 2025 which they responded that the CDBG Solicitation is postponed until a federal <br />budget is passed. <br />• Staff will be working with a consultant to implement Hardcourt Improvements within <br />Hazelnut Park. <br />• Hazelnut Parking Lot Status Update: Cost-share and maintenance responsibility <br />negotiations continue with the Church representatives. The City has the parking lot <br />resurfacing project budgeted for construction in 2025. Actual timing is dependent on <br />Agreement renewal. <br />• Staff has been working on the annual Street Maintenance project for 2025. This work <br />includes trail fog seal maintenance along the trail of Valentine Parking lot and repaving a <br />segment of trail from Highway 96 to Arden View Drive. <br />New/Updated Items: <br />• The pavilion roof at Cummings Park was replaced in early May. <br />• Council has negotiated with a private developer as part of the PUD for the site for a <br />trail to be added along the west side of Snelling Ave from Highway 96 all the way <br />down to Royal Hills Park. This work is likely to take place in 2026 and will be owned <br />and maintained by the City once completed. <br />• Old Highway 10 Trail, City staff is working with a consultant to pursue grants and <br />state bonding funds. Estimated project cost is now projected to be $4.5 million. <br />o Met Council Regional Solicitation – SRTS: $1,000,000 (City was awarded <br />this grant) <br />o MnDOT – SRTS: $1,000,000 (City was awarded this grant) <br />o State GO Bond funds: $1,650,000 (pursuing) <br />o Ramsey County contribution: $1,227,500 <br />o Remainder to be paid through Municipal State Aid and PIR Funds <br />Council has directed Staff to have the Consultant finish the design documents over <br />this summer and then bidding the project this winter for construction in 2026. <br />• Hamline Avenue Trail connection with Roseville – Lake Josephine <br />o Arden Hills staff is coordinating trail improvements with the City of Roseville <br />for a trail connection along the west side of Lake Josephine with anticipated <br />construction in 2026. <br /> An open house event took place on May 1, 2025, at Autumn Grove <br />Park hosted by the City of Roseville. It was well attended and <br />provided great feedback from the community. <br />• The 2025 Parks Project (Arden Oaks Park & Freeway Park), had its preconstruction <br />meeting on April 28th with the Contractor, Designer and PW staff. <br />Next steps are: <br />o May – demo park structure; installation of structure at Freeway Park <br />o Early June – demo park structure; installation of structure at Arden Oaks Park <br />o June – start work on sitework at Freeway and Arden Oaks Park. <br />o Substantial Completion mid-Summer/ early Fall 2025 (weather permitting) <br />o Final Completion-end of Fall 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.