My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10-13-1998
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1998
>
CC 10-13-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:55 PM
Creation date
11/9/2006 3:22:38 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS CITY COUNCIL - OCTOBER 13, 1998 13 <br />. Councilmember Malone asked ifit's too late in the year to complete the project due to <br /> temperature. Mr. Brown stated the temperature is not a problem. <br /> Mr. Fritsinger indicated a questionnaire was included in the non-agenda items from the A V <br /> consultants. He indicated he has received comments back from Councilmember Malone and <br /> would need the comments from the rest ofthe Council prior to the meeting next week. <br /> Mr. Fritsinger stated Staff is targeting January 23, 1999 as the date for the town hall meeting. He <br /> asked for concerns on this date, as it is the only date available in January. There were no <br /> concerns. <br /> Mr. Fritsinger stated Media One has started work on the upgrade of the cable system. The work <br /> started in Shoreview and they are working their way into Arden Hills. Amplifier boxes are being <br /> constructed which will be approximately nine feet long by four feet high, not the small pedestal <br /> type normally seen in people's yards. Media One is planning to place nine of these boxes in <br /> Arden Hills. If the Council wants to see what theses boxes look like, one is in place in <br /> Shoreview on the south side of Highway 96, east of Victoria Boulevard. <br /> Mr. Fritsinger reported Mr. Stafford met with Media One to determine the location of these <br /> boxes. Staff does not want the boxes to be installed on property corners in the right-of-way since <br /> some of the right-of-ways do not have enough room. Media One has provided Staff with a map <br /> showing the proposed locations of the boxes and they have made a reasonable attempt to locate <br />. them in different spots which are not in plain view. Mr. Fritsinger noted Staff needs to work on <br /> the right-of-way ordnance since the City is currently not allowed a great deal of input on how <br /> these type of installations are to take place. He indicated Mr. Stafford felt comfortable with how <br /> the boxes would fit into the community. However, concerns may be brought up to the Council <br /> from residents as the boxes are installed. <br /> COUNCIL COMMENTS <br /> Councilmember Larson asked regarding the questionnaire and if Electronic Interiors had one <br /> intended for new construction rather than renovation. Mr. Fritsinger indicated, if the word <br /> "renovation" was replaced with "new construction," the questionnaire would still read the same. <br /> Councilmember Larson expressed he is pleased to see the report from NSP indicating they intend <br /> to leave the power line being replaced underground. He suggested the City send a letter of <br /> appreciation to NSP for their reconsideration. Mayor Probst stated once the plan is confirmed, <br /> the City will take this action. <br /> Councilmember Malone reported the AMM has come to a conclusion on what to suggest to the <br /> Legislature in the appointed vs. elected officials debate. The AMM has determined there are <br /> three choices. One would be to continue the appointment process. Second would be a combined <br /> appointed and elected process in which the appointed board would do the planning functions and <br /> the elected board would run the operation. The third option would be to switch entirely to an <br />. election process. The issue was debated and the AMM expressed concern about developers <br /> trying to influence the elections and the lack of representation. The AMM has determined the <br /> terms should be fixed and staggered and it appears the option of an election process will go <br /> through the Legislature. <br />
The URL can be used to link to this page
Your browser does not support the video tag.