My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10-13-1998
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1998
>
CC 10-13-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:55 PM
Creation date
11/9/2006 3:22:38 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS CITY COUNCIL - OCTOBER 13, 1998 3 <br />. The Building Official has requested that the City Attorney notify the Court of the proceedings of <br /> the City Council. The City Attorney has informed Staff that they will be notifying the Court of <br /> the City Council's actions to date. <br /> At the previous City Council meeting, the property owner asked that, ifthe home is to he torn <br /> down, he he allowed to perfonn the demolition. Staff would have concerns about the owner's <br /> ability to tear the structure down within 30 days. Additionally, the property owner would be <br /> responsible for the sewer and water disconnects, removal of the foundation, and filling in the <br /> basement with suitable material and compacting and seeding that area. He would also have to <br /> obtain a demolition permit prior to beginning the work. <br /> Staff obtained three bids for the demolition in the event the Council chose to have the City <br /> conduct the work. The bids range from $7,200 to $14,500. Although the expenditure offunds <br /> for this activity was not accounted for in the 1998 budget, the City has received authorization <br /> from the Court to recover its cost through either an assessment on the property or a judgment <br /> against the property owner. The land values ofthe surrounding properties range from $37,100 to <br /> $51,000 and such an assessment would appear likely to be recovered. <br /> Mr. Ringwald advised that Staff recommends authorizing Ray Anderson & Sons to proceed with <br /> the demolition of the home located at 1369 Forest Lane and assess all the costs of the project <br /> against the subject property. <br />. Mr. Nixon stated that as of last Friday, he was ready to proceed. He then discovered Staff did <br /> not believe he could complete the project for the $30,000 he plans to borrow. He noted his <br /> contractor, Mr. Steve Kmger, is present with price lists showing it can be done for this amount of <br /> money. He indicated his private lender is concerned that the City is stating they want control of <br /> the money. <br /> Mr. Ringwald indicated that the City does not want control of the money but would like to either <br /> see the check or some sort of assurance that the money is available. <br /> Mr. Kruger stated the City wanted him to have a State Contractors License and noted he has been <br /> doing this work for 27 years and has never needed one before. He stated he has gone to the <br /> Department of Commerce and was told that as long as he is not making more than $15,000 on <br /> the project, he can obtain the license free of charge. He has filled out the application and was <br /> assured it will be approved. Regarding the financing issue, he stated the Council may call the <br /> lender, Mr. Gary Wisner, between 9:00 and 10:00 a.m. tomorrow to verify the financing. Mr. <br /> Wisner can provide information to the Council and his accountant can confirm there will be <br /> $30,000 put aside tomorrow, in an account, for the project. Mr. Kruger gave the Council Mr. <br /> Wisner's phone number. <br /> Mr. Kruger stated that the belief of the City that the project cannot be done for less than $60,000 <br /> is incorrect and he has compiled a list of the materials needed and their cost as of this weekend's <br /> prices. The project is set up to be delivered in separate loads. The first load, consisting of <br />. materials to complete the entire second floor and the roof, is planned to be delivered this week. <br /> Mr. Kruger reviewed the pricing of all the materials and concluded the total price for materials <br /> will be $14,898. With the additional cost of$l,OOO for the permit, the total cost will be just <br /> under $16,000. The remaining balance of the $30,000 will cover the cost oflabor. He has five <br /> people scheduled to begin the work immediately who are committed to working quickly to meet <br /> -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.