My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 11-30-1998
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1998
>
CC 11-30-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:55 PM
Creation date
11/9/2006 3:22:42 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS CITY COUNCIL - NOVEMBER 30, 1998 13 <br />. however, he did not have the new estimate available. The memo he had provided for this <br /> evening's meeting reviews these cost reductions as well as a comparison of the median and non- <br /> median alternatives. <br /> Mr. Brown stated the totals at this time for construction and easement acquisition for the median <br /> alternative was $1.78 million dollars, the non-median alternative was $1.54 million dollars, for a <br /> difference of approximately $238,000. The median alternative has a 15% wider footprint than <br /> the non-median alternative. The bitunlinous area of the median alternative was approximately <br /> 1,200 square meters less than the non-median alternative, however, the total prepared base area <br /> of the median alternative was approximately 600 square meters greater than the non-median <br /> alternative due to the larger amount of curb and gutter included in the median alternative. The <br /> larger footprint of the median alternative was reflected in additional common excavation costs <br /> and retaining wall costs totaling $48,150. <br /> The estimated storm sewer costs for the median alternative was greater than those for the non- <br /> median. The difference was a result of a longer pipe length for each series of catch-basins and <br /> approximately 14 extra catch-basins for median drainage. <br /> The median alternative would require the acquisition of a six-foot wide strip along the existing <br /> private properties to provide for a minimum of six feet of right-of-way adjacent to the eastern <br /> curb line. With the non-median alternative the six-foot right-of-way would be available now. <br />. The median alternative would also require additional sodding of the medians at a minimum, the <br /> installation of irrigation sleeves for the median areas, and additional signage and mobilization <br /> costs. <br /> Mr. Brown indicated he also reviewed the cost per foot comparison. Recent residential street <br /> reconstruction projects within the City have cost approximately $200 per foot ofroadway. The <br /> proposed improvements for West Round Lake Road Phase II are estimated to cost approximately <br /> $575 for the median alternative or $550 for the non-median alternative. The primary reasons for <br /> this are: <br /> 1. The proposed pavement section includes 70% more bituminous surface mix, 50% more <br /> aggregate base and 50% more sand sub-base than the typical residential street. The <br /> heavier pavement section was necessary to provide for adequate carrying capacity for the <br /> truck traffic expected on the roadway. <br /> 2. Traffic control improvements include significant allowances for traffic control which <br /> includes items such as a concrete .T-barrier, temporary paving, temporary signage and <br /> temporary striping which normally are unnecessary for low volume residential streets. <br /> Mr. Brown indicated the estimate for this cost may be conservative and until the staging <br /> was worked out it will not be known ifthe J-barrier will be needed. <br /> 3. The roadway was much wider than a standard residential street. The non-median <br />. alternative includes the construction of a 44-foot roadway with a 6-foot wide sidewalk. <br /> Typical residential streets are 32-feet wide and do not include sidewalks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.