My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 11-30-1998
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1998
>
CC 11-30-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:55 PM
Creation date
11/9/2006 3:22:42 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS CITY COUNCIL - NOVEMBER 30, 1998 15 <br />. Mr. Post stated, since West Round Lake Road was designated as a Municipal State-Aid street, he <br /> has assumed the commercial/industrial rate to be used should reflect the 100% factor rather than <br /> the 70% for a standard commercial/industrial roadway. This standard was most closely reflected <br /> by Feasibility Study Alternative A with a 36-foot wide undivided roadway as modified by the a <br /> addition of a six-foot concrete sidewalk. <br /> Estimated roadway costs for this alternative were $823,375. In addition, storm drainage and <br /> sidewalk costs were estimated at $180,160 and $51,975, respectively. Total assessable costs then <br /> total $1,055,510. <br /> The amount of estimated assessments was then calculated as follows: <br /> 1. Total assessable costs were divided by 50% to reflect the non-assessable west side of the <br /> road. ($1,055,510/2 = $527,755) <br /> 2. The total length of the improvement was approximately 2,600 feet. On a front footage <br /> basis this equates to $202.98. ($527,755/2,600) <br /> 3. The southerly portion of the improvement from Gateway Court to Gateway Boulevard, or <br /> about 700 feet, is not assessable due to a pre-existing Development Agreement which <br /> includes the Welsh Phase II building. <br />. 4. Total assessments were then calculated at $385,662 ($202.98 * (2,600 - 700)). Assuming <br /> the five assessable property owners had comparable front footage, the estimated average <br /> per property assessment would be approximately $77,132. <br /> These assessment may be increased by adding 36.5% of the costs of street lighting or <br /> landscaping appurtenances which may be included as part of the improvement scope <br /> (1,900'/2,600' = 73.1 % * appurtenance cost/2 = 36.5%). <br /> Mayor Probst referred to item number three and stated he believed there was language which did <br /> allow the City to assess this area according to the valuation under certain conditions. Mr. Post <br /> noted at that time the buildings had not yet been built. Mr. Fritsinger stated that in theory they <br /> are meeting the assessment agreement. Another consideration to this is that property taxes for <br /> the property are within the TIF District and will be captured to pay for the West Round Lake <br /> Road intersection. <br /> Mayor Probst asked for the status of Ramsey County's valuation of the property. Mr. Post <br /> explained the only parcel which has been valued thus far was Phase I, the MSL building. The <br /> specific issue was that the building assessment was fine, however, Staff felt the land value was <br /> low given recent market activity. Mr. Post indicated he had received assurances that the value <br /> will be increased to approximately $2 per foot. <br />. Mr. Post referred to page two of this Staff memo and explained the various funding sources. <br /> There was a funding shortfall, prior to any enhancement costs, of $283,386 for the median <br /> alternative and $97,271 for the non-median alternative. The enhancements push up the shortfall <br /> and there was a possibility that this short fall could be funded by the Non-Assessable Road <br />
The URL can be used to link to this page
Your browser does not support the video tag.