My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
05-27-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2025 6:25:58 PM
Creation date
6/20/2025 6:21:48 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
www.srfconsulting.com <br />3701 Wayzata Boulevard, Suite 100 | Minneapolis, MN 55416-3791 | 763.475.0010 Equal Employment Opportunity/Affirmative Action Employer <br />SRF Project No. 16750.00 <br />May 21, 2025 <br />David Swearingen Public Works Director / City Engineer City of Arden Hills 1245 Highway 96 West Arden Hills, MN 55112 <br />Subject: Proposal for Professional Services for Amendment for Professional Services for Final Design and Construction Administration for Old Highway 10 Trail Arden Hills, Minnesota <br />Dear David Swearingen: <br />Based on your request, SRF Consulting Group, Inc. (SRF) is pleased to submit this amendment to provide professional services for construction documents and construction administration for a proposed trail along Old Highway 10 from Lake Valentine Road to Highway 96. The trail has previously been designed by SRF to a 95% completion level. This contract will finalize plans for <br />bidding and provide for construction administration. <br />Scope of Services <br />We propose to carry out the work (“Scope of Services”), set forth in Attachments B, attached <br />hereto and incorporated into this Agreement. <br />Assumptions <br />Specifications, Final Permits, Project Manual, bidding support, and construction administration are based on the assumption that final construction plans will proceed per the 95% plans <br />provided to the City in 2024. Changes to the design direction that deviate from the 95% plans <br />may be grounds for additional services. <br />Funding includes State of Minnesota Safe Routes to School and Metropolitan Council Regional <br />Solicitation (Non-Federal) sources, and project will need to comply with State Aid funding and <br />review requirements. <br />Additional assumptions are included in Attachment B. <br />Construction anticipated in 2026. <br />Schedule <br />We will complete this work within a mutually agreed-upon time schedule.
The URL can be used to link to this page
Your browser does not support the video tag.