My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
05-27-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2025 6:25:58 PM
Creation date
6/20/2025 6:21:48 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />7 <br />and/or angles shall be completed before the applicable security is released. The Developer’s <br />surveyor shall also submit a written notice to the City certifying that the monuments have been <br />installed. <br />10. PERMITS. The Developer shall obtain or require its contractors and <br />subcontractors to obtain, prior to any site activities, all necessary permits, including but not limited <br />to the following to the extent required: <br />• Rice Creek Watershed District <br />• City of Arden Hills for Building Permits <br />• City of Arden Hills Grading and Erosion Control Permit (Escrow will be <br />determined at the time of application) <br />• City of Arden Hills Right-of-Way Permit (Escrow will be determined at the <br />time of application) <br />• City of Arden Hills Water and Sewer Connection Permits <br />• Ramsey County Right-of-Way Permit <br />• MnDOT Right-of-Way Permit <br />• NPDES Construction Stormwater Permit <br /> <br />11. LICENSE. The Developer and NHLC hereby grant the City, its agents, <br />employees, officers and contractors a license to enter the Subject Property to perform all <br />reasonable work and inspections deemed appropriate by the City in conjunction with the <br />Development. <br /> 12. EROSION CONTROL. Prior to initiating site grading, the erosion control plan <br />shall be implemented by the Developer and inspected and approved by the City. The City may <br />impose additional erosion control requirements if reasonably required. All areas disturbed by the <br />excavation and backfilling operations shall be stabilized immediately when it is known that <br />construction activities will not resume for fourteen (14) days after the completion of the work, <br />weather permitting, or plan to utilize temporary cover on portions of the site that will sit dormant <br />for these periods of time whether or not final grading has been completed unless authorized and <br />approved by the City Engineer. Except as otherwise provided in the erosion control plan, seed
The URL can be used to link to this page
Your browser does not support the video tag.