My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
05-27-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2025 6:25:58 PM
Creation date
6/20/2025 6:21:48 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />15 <br />The City is implementing a pass through billing process. The $2,008,058.20 escrow will be held <br />and all bills will be forwarded for immediate payment. If payments are not made in a timely <br />fashion, the project will stop until payments are made. If said fees are less than estimated, the City <br />shall reimburse the Developer within thirty (30) days of receipt of final invoices. <br /> 27. RESPONSIBILITY FOR COSTS. <br /> A. Except as otherwise specified herein, the Developer shall pay all costs <br />incurred by it or the City in conjunction with the development of the Development Property, <br />including but not limited to Soil and Water Conservation District charges, legal, planning, <br />engineering and inspection expenses incurred in connection with approval of the Development, <br />the preparation of this Agreement, review of construction plans and documents, and all costs and <br />expenses incurred by the City in monitoring and inspecting development of the Subject Property. <br /> B. The Developer shall reimburse the City for reasonable costs incurred in the <br />enforcement of this Agreement, including engineering and attorneys’ fees. <br /> C. Intentionally omitted. <br /> D. The Developer shall pay in full all bills submitted to it by the City for <br />obligations incurred under this Agreement within thirty (30) days after receipt. If the bills are not <br />paid on time, the City may halt plat development and construction until the bills are paid in full. <br />Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18%) per <br />year. <br /> E. In addition to the charges herein, other charges as required by City <br />ordinance may be imposed such as, but not limited to, building permit fees. <br /> 28. DEVELOPER’S DEFAULT. In the event of default by the Developer as to any <br />of the work to be performed by it hereunder, the City may, at its option, perform the work and the
The URL can be used to link to this page
Your browser does not support the video tag.