Laserfiche WebLink
H:\KIMLEYHO_PR\0T4133552000\2_Preliminary\C_Reports\Preliminary Design Report Update\Report Update\Water Preliminary Engineering Analysis\Memo-Rice Creek Commons Water <br />Distrib Sys Modeling Results Update Final Draft 01.24.2025.docx <br />MEMORANDUM <br />Date: January 24, 2025 <br />To: David Swearingen, City of Arden Hills – Public Works Director <br />John Mazzitello, Ramsey County – Deputy Director of Public Works <br />Eric Fosmo, Kimley Horn TCAAP/Rice Creek Common Project Manager <br />From: Mitchell Swanson, P.E. – Environmental Project Engineer <br />Ryan Peterson, P.E. – Senior Project Manager <br />Subject: Rice Creek Commons Water Distribution System Modeling Results Update <br />Kimley-Horn <br />Project No.: 0T4.133552 <br />2024 Water Distribution System Modeling Results Update Introduction <br />Ramsey County has moved forward with a project to complete plans and specifications for construction <br />of Spine Road through the TCAAP property/Rice Creek Commons Redevelopment Site (RCC). Kimley <br />Horn, with Bolton & Menk as a sub-consultant,was contracted to complete these plans and <br />specifications and all associated tasks necessary to provide a biddable contract documents plan set. <br />Task 5 of the work plan requires updating a 2015 Preliminary Design Report for the sanitary sewer and <br />potable water systems. A few land use changes have also been adopted since 2015 that impact the <br />potable water system demand that will be generated by the site upon future development, and <br />subsequent water model results. This memo provides the update of the Water Distribution System <br />Modeling Results. A sister memo will be provided for the Sanitary Sewer System Preliminary Engineering <br />Analysis. <br />Technical Memorandum Format <br />To help any user of this memo understand the original report, this memo includes the original memo <br />text in blue italics for easy referencing. The updated analysis is in standard text format. The report will <br />follow this format for each section. The format will be: <br />Section Title <br />Updated engineering analysis text… <br />Original engineering analysis text… <br />Introduction <br />The purpose of this technical memorandum is to update the original Water Distribution System <br />Modeling Results for the proposed potable water system design needs for the TCAAP Site/Rice Creek <br />Commons development project (RCC) that was originally completed in June 2015. Further modeling <br />analysis is required based on the changes to the development planning since the original study was <br />completed. Since the original study, the model was converted to Infowater Pro modeling software. The <br />Attachment A