My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-25-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
05-27-25-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2025 6:32:45 PM
Creation date
6/20/2025 6:26:13 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Distribution System Hydraulic Model Calibration and System Evaluation Report <br /> Chapter 5 – Water Distribution System Field Testing <br /> December 2019 <br /> <br /> <br />P05049-2019-000 Page 17 <br /> <br />To properly calibrate the model, the following information was recorded at the time of the fire <br />hydrant flow test: 1) time and date; 2) hydrant location; 3) flow of hydrant being flowed; 4) <br />duration of the hydrant flow test; and 5) static and residual pressures at the corresponding <br />hydrant location. The results of the fire hydrant flow tests are discussed in Chapter 6. <br />Simultaneous information from the SCADA system on water storage levels and Booster Station <br />pumping rates was also collected and used in the calibration process. <br />5.2 Extended Pressure Testing <br />To gain background information on the roughness coefficient of water mains, extended pressure <br />testing was performed at eight (8) locations throughout Arden Hills’ water distribution system. <br />HPRs were installed on fire hydrants for approximately one week (from June 20th through July <br />1st, 2019) to record changes in pressures within the distribution system. Appendix B contains <br />a map indicating the location of each extended pressure test as well as field data sheets showing <br />detailed locations of each extended pressure test. The locations for Tests 3 and 5 were only <br />used during the fire hydrant flow tests in order to measure the water tower levels. At the start <br />of the extended pressure testing period, the HPRs for Tests 3 and 5 were moved to different <br />locations. The field pressures for the EPS tests were sampled at 1 second intervals and the <br />minimum, maximum, and average pressures were recorded at 5 minute intervals to allow for <br />extended data logging. This data was used to fine-tune pipe roughness coefficients of water <br />mains in the distribution system. The results of the extended pressure testing are discussed in <br />Chapter 6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.