My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-23-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
06-23-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2025 6:37:59 PM
Creation date
6/20/2025 6:31:32 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order Detail - Charges <br />Work Order:FL-PW-2025-892 - Remove snow gear including under body <br /> Date In:04/22/2025 06:46AMFL-85128 - 2022 MACK GR42F SINGLE AXLE 10.8LWO Status:Asset:CLOSED <br />04/24/2025 06:46AM Date Due:FL-AH - CITY OF ARDEN HILLSDepartment:Job Type:REPAIR <br />Account:Project Code: Estimated Completion:FLEET ASSIGNMENT/WO <br />Serial:Warranty:User Opened: Date WO Opened:04/22/2025 06:46AMNO1M2GR2AC4NM00162529984 <br />License:User Finished:Repair Reason: Date WO Finished:04/22/2025 03:15PMMR28378 <br />Accident:User Closed: Date WO Closed:04/23/2025 04:55AM28658 <br />Contact: Meter 1:8,515 JEFF FRID <br /> Meter 2:0 <br />Work Order Summary <br />Internal <br />Labor Parts Overhead Labor Parts Misc <br />Commercial <br />Tax/Markup <br />Equipment Usage <br />Charges <br /> 10.00 0.00 0.00 0.00 0.00 0.00 658.80 0.00 <br />Total Work Order Costs: $ 668.80 <br />Work Order Details <br />Labor <br />Transaction Date EmployeeTaskDepartment Account <br />28378 - Ryan Milbrandt04-22-2025 08:07AM 064-002 - FL-REMOVE SNOW EQUIPMENTN/A FLEET LABOR 1.30 117.00 <br />28378 - Ryan Milbrandt04-22-2025 11:15AM 064-002 - FL-REMOVE SNOW EQUIPMENTN/A FLEET LABOR 3.02 271.80 <br />28378 - Ryan Milbrandt04-22-2025 03:15PM 064-002 - FL-REMOVE SNOW EQUIPMENTN/A FLEET LABOR 3.00 270.00 <br />Total Overhead CostSmall Parts Markup -PartsSmall Parts Markup - LaborOverhead Costs <br />Overhead <br />Tools Charges <br /> 10.00 10.00 0.00 0.00 0.00 <br />©2025 AssetWorks LLC. All Rights Reserved.Page 12 of 13 <br />Report Date: 5/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.