My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-23-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
06-23-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 8:24:52 AM
Creation date
6/20/2025 7:30:40 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills <br />Project B2502087 <br />June 13, 2025 <br />Page 6 <br />GPR scan does not imply an absence of one within the pavement section. Refer to our pavement core and <br />hand auger boring results for approximate aggregate base depths in these locations. <br />B.3. Pavement Core Results <br />We performed pavement coring and hand auger borings at 23 locations along the various roads, as <br />shown in the sketch in the Appendix. HABs were also performed through the aggregate base layer and <br />into the shallow subgrade in core locations. <br />The pavement cores and HABs were used to measure pavement layer thicknesses for the bituminous and <br />aggregate base layers, to assess bituminous conditions, and determine the shallow subgrade soil type. <br />The results are presented below. <br />We did not perform gradation analysis on the apparent aggregate base material encountered as part of <br />the pavement section, in accordance with our scope of work. Therefore, we cannot conclusively <br />determine if the encountered material satisfies a particular specification. <br />Table 2. Summary of Pavement Section Thicknesses by Boring/Core Location <br />Street <br />Boring/Core <br />Locations <br />Bituminous <br />Thickness <br />(in.) <br />Aggregate Base <br />Thickness <br />(in.) <br />Overall Pavement <br />Thickness <br />(in.) <br />Karth Lake Circle <br />ST-1 5 1/2 5 10 1/2 <br />ST-2 3 3/4 4 7 3/4 <br />ST-3 9 1/4 3 12 1/4 <br />Karth Lake Drive <br />ST-4 6 1/2 6 12 1/2 <br />ST-5 5 8 13 <br />ST-6 9 8 6 1/4 <br />Pleasant Drive <br />ST-7 8 1/2 5 13 1/2 <br />ST-8 5 1/2 2 7 1/2 <br />ST-9 4 3/4 14 18 3/4 <br />Pleasant Circle <br />ST-10 7 3 10 <br />ST-11 8 4 12 <br />Amble Drive <br />ST-12 3 1/2 7 10 1/2 <br />ST-13 3 3/4 12 15 ¾ <br />ST-14 3 3/4 9 1/2 13 1/4 <br />ST-15 6 1/2 1 7 1/2 <br />ST-16 5 1/2 7 12 1/2
The URL can be used to link to this page
Your browser does not support the video tag.