Laserfiche WebLink
ARDEN HILLS CITY COUNCIL WORK SESSION — MAY 27, 2025 21 <br />Public Works Director/City Engineer Swearingen said he can request Bolton and Menk to do <br />some further modeling and hydrant testing within this design. The water modeling would take two <br />weeks to coordinate. <br />Mayor Grant asked for confirmation we would add two weeks to the entire thing. <br />Public Works Director/City Engineer Swearingen confirmed. <br />Mayor Grant said once they get started after they have resources. If we tell TCAAP this will <br />take 3-6 months, that would be an issue. <br />Councilmember Holden asked if we have talked to the fire department. She thinks the <br />complaints of low pressure has gone away since the Roseville connection was completed. <br />Mayor Grant said the Roseville connection and there was another on Bethel. He thinks the <br />Bethel redundancy was put in prior to that study. <br />Public Works Director/City Engineer Swearingen confirmed. That Bethel watermain line was <br />put in in 2018 and the study was done in 2019. <br />Mayor Grant said if it's only a two week effort, there can't be that much cost. <br />Public Works Director/City Engineer Swearingen said it can depend on if they have existing <br />data they can plug in. <br />Councilmember Weber repeated that he does not want to see a model where they are saying it <br />may or may not be correct. He understands caveating your work with some protection, in case <br />you're wrong. This is a big investment for our city. <br />Mayor Grant added we have a higher residential level than previously. That changes things. He <br />doesn't know if commercial or residential use more water. <br />Councilmember Weber thinks it's commercial. That may be why they downgraded the size of <br />the tower. Multi -family aren't always watering lawns but almost all commercial properties do all <br />the time. <br />Mayor Grant would like to be updated with the overall cost of trunk utilities, tower and anything <br />else that is in the Joint Powers Agreement, that is City responsibility and expense. It's been <br />several years since he's seen updated numbers. <br />Public Works Director/City Engineer Swearingen just got the latest trunk utilities estimates <br />this morning. This is based off of the latest 60% design. The watermain trunk utilities is just over <br />$1.25 million. He said a 20% contingency should be added to utility numbers. The sanitary sewer <br />trunk main is $2.6 million. That includes the lift station. The water tower is $7 million. The <br />Roseville trunk main improvement is up to $800,000. <br />Councilmember Holden asked what size the water tower is. <br />Public Works Director/City Engineer Swearingen said 0.75. <br />