My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-30-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
06-30-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 4:54:37 PM
Creation date
7/10/2025 4:45:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 63ACAE11-BF2F-4D18-8584-6E88FC07AE08 <br />Permitting: Pre -Install Questionnaire <br />1. Timeline <br />• In Flock Safety's experience, in-depth permitting requirements can add 2+ <br />months to the installation timeline. <br />• The SLA for permit document submission is within 15 days from contract <br />signature date (contract Closed -Won) <br />2. Right of Way <br />• Will any Flock Safety cameras be installed on the city, state, or power <br />company -owned poles or in the city, county, or state Right of Way (RoW)? <br />o What is the RoW buffer? <br />o Will additional permits or written permission be required from third -party <br />entities (such as DOT, power companies, public works, etc.)? <br />• Will any cameras be installed on city -owned traffic signal poles (vertical <br />mass)? <br />o If yes, please provide heights/photos to determine if a bucket truck is <br />needed for the installation. <br />■ Note: A bucket truck is required if the height exceeds 15 feet tall. <br />3. AC Power vs. Solar <br />• If AC powered, is there a 120V power source available, and is there access to <br />an electrician who can connect the existing wire to the Flock Safety powered <br />installation kit? <br />• If solar -powered, consider the size of the solar panel and potential to impact <br />the visibility of DOT signs/signals: <br />o Single Panel: 21.25" x 14" x 2" (Length x Width x Depth) <br />o Double Panel: 21.25" x 28" x 2" (LxWxD) <br />4. Traffic Control & Installation Methods <br />• If a bucket truck is required, this typically necessitates an entire lane to be <br />blocked in the direction of travel. Can you provide a patrol car escort, or will <br />full traffic control be required?* <br />PLEASE NOTE: If traffic control is required, you may incur additional costs <br />due to city/state requirements; Fees will be determined by quotes received. <br />frock safety 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.