Laserfiche WebLink
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hills, MN <br />Project # <br />26-W-001 <br />Project Name <br />TCAAP New Booster Station <br />Total Project Cost <br />$1,500,000 <br />Contact <br />Public Works Director <br />Department <br />Water Department <br />Type <br />Improvement <br />Category <br />Utility Improvements <br />Priority <br />2 Very Important <br />Status <br />Active <br />Useful Life <br />30 years <br />TCAAP <br />Yes <br />Description <br />This item would construct an additional Water Booster Station near Old Highway 10 and 1-694 to pump water from the low pressure zone to the high pressure <br />zone. The booster station would be built on excess Ramsey County right of way and the structure would be made to look like a residential house due to its <br />location. <br />SCADA upgrade and full system implementation to be included with this project <br />justification <br />The City's water system currently only has one booster station providing water to the high pressure zone through a single crossing of 1-694. If anything (lighting <br />strike, wind storm, etc.) knocked out the current booster station for any length on time the high pressure zone could be out of water after the half million gallon <br />tower is drained. Construction of a second booster station will provide needed redundancy in the system so if one booster station fails or is taken down for <br />service the high pressure zone will still be provided water. <br />The current Preliminary Design Report related to the TCAAP Spine Rd. indicates that the new water booster station should be constructed on the same timeline. <br />Expenditures <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Construction/Maintenance <br />1,500,000 <br />0 <br />0 <br />0 <br />0 <br />1,500,000 <br />Total 1,500,000 <br />0 <br />0 <br />0 <br />0 <br />1,500,000 <br />Funding Sources <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />TCAAP -WAC/SAC Charges <br />1,500,000 <br />0 <br />0 <br />0 <br />0 <br />1,500,000 <br />Total 1,500,000 <br />0 <br />0 <br />0 <br />0 <br />1,500,000 <br />69 <br />Produced Using Plan -It CIP Software Page 65 / 73 <br />